MP:  000418.400

 

Updated December 13, 2022

 

Total Accidents:   3
Crossing DOT #:  352281H
TOTAL DAILY TRAINS:   14   (AS OF 2016)

 

Page created by: freebrickproductions

 

This crossing is located on the CSX S&NA South Subdivision.

 

>>>>>>>>>>>>> Signal #1 Signal #2
Bell: N/A NEG electronic
Base:

4" Modern Industries clamp-style

5" Modern Industries

4" Modern Industries clamp-style

5" Modern Industries

Light Frames: 4 - 12x24" Safetran 4 - 12x24" Safetran
Gate Lights: 3 - RECO LEDs 3 - RECO LEDs
Gate Mechanism: GRS Type D GRS Type D
Gate Striping: Vertical Vertical

 

1

2

3

4

Overviews of the crossing.
The first signal.

5

6

7

8

A Modern Industries clamp-style base.
The emergency information.
This signal has Safetran 12x24 inch lights.

9

10

11

12

A 5 inch Modern Industries base.
The gate mechanism is from GRS!
The LED gate lights are from RECO.
The second signal.

13

14

15

16

Another Modern Industries clamp-style base.
It has more Safetran 12x24 inch lights.

17

18

19

20

The emergency information.
This signal uses an NEG electronic bell.
Another 5 inch Modern Industries base.
Another GRS gate mechanism!

21

22

23

24

More RECO LED gate lights.
The relay case.

Track view looking south towards Dargin Road

and US 31 #3 near Calera.

Track view looking north towards Snow Drive.

25

26

A couple more overviews of the crossing.

27

28

A return trip to the crossing on 11-27-17 catches the crossing in action!

29

30

31

32

A rail train slowly approaches the crossing!

33

34

35

36

The rail train crawls across the crossing, as it's laying out rail.

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

A CSX worker prepares to cut the rail so they don't lay it across the road.

73

74

75

76

The CSX worker cuts the rail before cutting a hole in the end that's still on the train.

77

78

79

80

The freshly laid rail.
After almost 30 minutes, the train clears the crossing.

81

82

83

84

The crossing deactivates.

85

86

87

88

The crossing reactivates as the train backs-up to the crossing so they can lay out more rail on the north side.

89

90

91

92

The rail train continues to lay out rail as it continues north.
Another train is coming!
The crossing activates again!

93

94

95

96

A truck drives around the gates just before they start to raise.

97

98

99

100

The crossing activates again before fully deactivating!
The train continues to approach the crossing.

101

102

103

104

The crossing deactivates again!
The crossing activates once more.
The train continues to approach.

105

106

107

108

The train finally crosses the crossing...

109

110

111

112

The train is a local freight from Calera, AL with a pair of AC44CWs pulling it! They are heading to switch some storage tracks just north of the crossing.

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

The train clears the crossing...

129

130

131

132

...and the signals deactivate...
...only to have a tail-ring malfunction occur...

 

 

 

 

Pictures 1-26 were taken on 2-18-17.

Pictures 27-132 and the first and second videos were taken on 11-27-17.

The third video was taken on 1-8-22.