MP:  648.239

 

Updated December 13, 2022

 

Total Accidents:   1
Crossing DOT #:  667574J
TOTAL DAILY TRAINS:   20   (AS OF 2016)

 

Page created by: freebrickproductions

 

This crossing is located on the BNSF Birmingham Subdivision.

 

1

2

3

4

Overviews of the crossing.
The first signal.

5

6

7

8

It has a Griswold base!
The lights on this signal are all 8 inch!
The main lights are Safetran 8 inch lights.

9

10

11

12

And the side lights are RACO 8 inch lights!
The bell is a General Signals Type-2 electronic bell.
The second signal.

13

14

15

16

It has a RACO base.
The DOT tag.

17

18

19

20

The lights on this signal are RACO 8 inch lights!
Track views.

21

22

23

24

The relay case.
The signals activate.

25

26

27

28

A rail crane comes through and the signals shut off shortly after.

29

30

31

32

A return trip to the crossing on 9-20-19 finds that both signals here were replaced!
The first new signal.

33

34

35

36

Both signals has L&W bases.
The emergency information.
The lights on this signal are all re-used Safetran 12x20 inch lights.

37

38

39

40

The bell here is a GS Type 1 e-bell!
The second new signal.
The emergency information.

41

42

43

44

The lights on this signal are all re-used Safetran 12x20 inch lights with Dialight Ball LEDs, with a mix of newer Safetran heads and a 70s Safetran light head.

45

46

47

The relay case is still the same for the time being.
Looking northeast towards US 278/AL 118.
Looking southwest towards CR 49 in Beaverton.

48

49

50

The crossing activates!

51

52

53

A southbound military train flies through with an H3 ES44DC leading an H2 Dash-9 and a "fakebonnet" Dash-9!

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

The train passes.

69

70

71

72

Another return trip to the crossing on 5-16-21 finds that both signals are having some foundation work done, and that a brand new relay case is going in here, but the old one was still in place and active at the time.

73

74

75

76

A third return trip to the crossing on 7-25-21 finds that the second signal has been remounted onto a new foundation and now has a new General Signals e-bell on it.

77

78

79

80

No apparent changes had occurred to the other signal here.
The new relay case is now active, and the old one was removed.

 

 

 

Pictures 1-28 and the first video were taken on 1-18-16.

Pictures 29-68 and the second video were taken on 9-20-19.

Pictures 69-72 were taken on 5-16-21.

Pictures 73-80 were taken on 7-25-21.