![]() |
MP: 0BA283.53 |
Updated December 13, 2022
Total Accidents: 2
Crossing
DOT #: 352060F
TOTAL
DAILY TRAINS: 25 (AS OF 2017)
Page created by: freebrickproductions
This crossing is located on the CSX S&NA North Subdivision.
| >>>>>>>>>>>>> | Signal #1 | Signal #2 |
| Bell: | Safetran Type 2 electronic | N/A |
| Base: | Safetran | Safetran |
| Light Frames: | 3 - 12x24" Safetran w/ Leotek EV Series LEDs 1 - 12x24" Safetran w/ WCH 2nd Gen LED |
4 - 12x24" Safetran w/ Leotek EV Series LEDs |
| Gate Lights: | NEG LED | NEG LED |
| Gate Mechanism: | Safetran 2000s | Safetran 2000s |
| Gate Striping: | Vertical | Vertical |
Overviews of the crossing. |
The first signal. |
||
It has a Safetran base. |
A Safetran gate mechanism. |
The emergency information. |
A Safetran junction box. |
This signal has all Safetran 12x24 inch lights with a mixture of three Dialight Ball LEDs and one WCH 2nd Generation LED! |
The lone bell here is a Safetran Type 2 electronic bell. |
||
This signal uses NEG LED gate lights. |
The second signal. |
||
It has another Safetran base. |
Another Safetran gate mechanism. |
The emergency information. |
Another Safetran junction box. |
This signal has more Safetran 12x24 inch lights with all Dialight Ball LEDs! |
This signal also uses NEG LED gate lights. |
||
The relay case. |
Track view looking northeast towards the private crossing. |
Track view looking southwest towards Carey Road in Piney Chapel. |
A return trip on 5-10-17 catches the crossing in action! |
|||
Two cars proceed to drive around the gates... |
|||
...which being to rise while the second car is crossing... |
...before the signals shut-off entirely. |
This empty northbound coal train with a YN2 AC44CW is what activated the crossing. However, he has to wait on someting first... |
|
The crossing activates again! |
A loaded southbound coal train comes through with three GEVOs pulling! |
|||
Meeting the northbound waiting in Carey Siding. |
An ES44AH works as the mid-train DPU! |
||
The train passes... |
|||
...and the gates rise... |
|||
...only to go back down a few minutes later. |
|||
The northbound coal train (CSX E040) with the YN2 AC44CW leading comes through this time! |
|||
The train passes... |
|||
...the gates rise once again... |
|||
...and the signals shut-off. |
The crossing activates a little while later, this time as seen from the other side! |
||
A northbound intermodal train with an ET44AH leading an ES44AH comes speeding through! |
|||
This train passes... |
|||
...and the signals eventually shut-off. |
|||
Another return trip to the crossing on 9-2-21 finds some upgrades to these signals. |
|
The first signal has had all of the Dialight Ball LEDs on it replaced with Leotek EV Series LEDs. |
|||
The second signal has had all of its Dialight Ball LEDs replaced with more Leotek EV Series LEDs as well. |
|||
The crossing activates! |
|||
CSX M781 comes south through the crossing with a lone GP40-3 for power. |
|||
The train passes... |
|||
...and the crossing deactivates. |
|||
Pictures 1-28 were taken on 5-8-17.
Pictures 29-132 and the first, second, third, and fourth videos were taken on 5-10-17.
Pictures 133-162 and the fifth video were taken on 9-2-21.