![]() |
![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() |
| >>>>>>>>>>>>>> | Northern Signal | Southern Signal |
| Bell: | GS Type 3 E-Bell | None |
| Base: | Safetran 5" Single Sided ^ | Safetran 5" Single Sided ^ |
| Lights: | 4 - 12"x20" Hawker Safetran w/ Dialight Ball LEDs | 4 - 12"x20" Hawker Safetran w/ Dialight Ball LEDs |
| Junction Box: | Safetran | Safetran |
| Gate Lights: | 4" RECO LEDs | 4" RECO LEDs |
| Gate Mechanism: | Siemens Imprinted w/ Standard Mount | Siemens Imprinted w/ Standard Mount |
| Gate Striping: | Vertical Striping | Vertical Striping |
| 1 |
2 |
| Overview of 2 gated signals facing north. |
Overview facing south. |
| 3 | 4 | 5 |
| 6 | 7 | 8 |
| 9 |
10 |
11 |
| The southern signal. |
||
| 12 | 13 | 14 |
| 15 | 16 | 17 |
| 18 | 19 | 20 | 21 |
| The northern signal. Up until a few months before these pictures were taken, this still had a Safetran mechanical bell. |
| 22 |
23 |
24 |
25 |
| The relay bungalow in the northeast quadrant. |
The grade is all wood. |
Track view facing west towards 11th Rd. in Leeds. |
Track view facing east towards N. 100 E. Rd. |
| 26 | 27 | 28 | 29 |
| 30 | 31 | 32 | 33 |
| Action shots from the train seen in the video below. |
| 34 |
35 |
| 36 |
37 |
38 |
| 39 |
40 |
41 |
42 |
| In February 2021, we see both gate mechanisms were replaced, the gates were replaced, and the GS Type 2 was replaced with a GS Type 3; odd considering the Type 2 was only about 5 years old. |