120.00


079713E

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS Type 3 E-Bell GS Type 3 E-Bell
Base: Siemens 5" Single Sided > Siemens 5" Single Sided >
Lights: 4 - 12"x24" Safetran w/ Dialight Ball LEDs 4 - 12"x24" Safetran w/ Dialight Ball LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: Siemens Imprinted w/ GSI Gate Saver Siemens Imprinted w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-25 and the 1st video were taken on February 2, 2017.
Pictures 26-27 and the 2nd video were taken on December 30, 2022.
The 3rd video was taken on January 3, 2023.
The 4th video was taken on February 13, 2023.
Picture 28 was taken on March 14, 2023.
Pictures 29-33 were taken on March 27, 2023.
Pictures 34-36 were taken on April 4, 2023.
Pictures 37-44 were taken on April 5, 2023.
Pictures 45-57 and the 5th video were taken on April 28, 2023.
Pictures 58-70 were taken on May 16, 2023.
Pictures 71-104 were taken on May 31, 2023.
Picture 105 was taken on June 6, 2023.
Pictures 106-112 and the 6th video were taken on June 13, 2023.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Mendota Sub.

1
2
Overview of 2 gated signals facing north.
Overview facing south.
3 4 5
6 7 8
9 10 11
The southern signal. Both signals had WRRS bases, 12"x20" Safetran frames with Dialight Ball LEDs, 4" RECO LEDs, and US&S Model 95 Style 1 gate mechanisms that replaced WRRS mechanisms around 2000.
12 13 14
15 16 17
18 19 20
21
The northern signal. This had a GS Type 2 E-Bell.
22 23 24 25
The relay bungalow in the southwest quadrant.
The grade is all concrete.
Track view facing west towards CR 550 E. in Neponset.
Track view facing east towards Main St.
26
27
In December 2022, I found a new bungalow for this crossing sitting in Neponset, a sign of things to come.
28
As of March 14, 2023, work had not yet started on this crossing.
29
30
31 32 33
By March 27th however, we see markings all around the crossing. Work was just starting to get underway.
34 35 36
On April 4th, we see the bungalow was moved slightly in Neponset, and I also spotted the new signals for this crossing sitting nearby.
38 39 40
41 42 43 44
The very next day on April 5th, the new bungalow was moved out to the crossing, but not yet offloaded from the maintenance truck.
45
46
47 48 49
50 51 52 53
54 55 56 57
By April 28th, a lot of work has progressed. The new bungalow was mounted, conduit was installed all around the crossing, and the new foundations were in place.
58
59
60 61 62
63 64 65
66 67 68
On May 16th, we see the new foundations and bungalow were already graveled in even though the old setup was still going for now.
69
70
Final overviews of the old setup. By the end of May, the new signals were installed and activated and the old bungalow and signals were removed.
71
72
Overview of the new signals facing north.
Overview facing south.
73 74 75
76 77 78 79
80 81 82 83
The new southern signal.
84 85 86
87 88 89 90
91 92 93 94
The new northern signal.
95 96 97 98
The new relay bungalow in the southwest quadrant.
The grade is all concrete.
Track view facing west towards CR 550 E. in Neponset.
Track view facing east towards Main St.
99
100
For some reason, the mounting brackets for the old bungalow were left in place.
101 102 103 104
Additional views of the work done to this point.
105
The old signals were seen sitting in Galva on June 6th.
106
107
108
109
110 111 112
By June 13th, the old foundations and the mounting brackets for the old bungalow were removed, thus finishing the new install.