59.77


004409T

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS Type 2 E-Bell None
Base: Safetran 5" Single Sided ^ Safetran 5" Single Sided ^
Lights: 4 - 12"x20" Safetran w/ Dialight Ball LEDs 4 - 12"x20" Safetran w/ Dialight Ball LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: Siemens Imprinted w/ New NEG 2 Way Saver Siemens Imprinted w/ New NEG 2 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-15 and the 1st video were taken on August 9, 2008.
Pictures 16-34 were taken on July 28, 2011.
The 2nd video was taken on May 21, 2011.
The 3rd video was taken on January 15, 2014.
Pictures 35-65 and the 3rd video were taken on December 23, 2014.
Pictures 66-69 were taken on December 19, 2015.
The 4th video was taken on April 21, 2019.
The 5th video was taken on September 28, 2019.
The 6th video was taken on September 6, 2022.
Pictures 70-81 and the 7th video was taken on April 25, 2023.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights as well.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Photos from August 2008.  At the time, the crossing had 12"x20" incandescent lights, 4" RECO incandescent gate lights, and a Safetran mechanical bell.  Click here to see the video of this train.

The US&S gate mechanism replaced an older Safetran gate mechanism in the mid 2000s.

In mid 2011, all of the lights on the signals were upgraded to LED.

16
17
Overview facing south.
Overview facing north.
18
19
20
21
The northern signal.
22
23
The southern signal.
24
25
26
27
The relay bungalow in the northeast quadrant.
The grade is all concrete.
Track view facing west towards Jugtown Rd.
Track view facing east towards Mazon St.
28
29
30
31
32
33
34
Action shots from 2 different BNSF trains.

In 2012 or 2013, the gates got updated with the newer block striping.
In late 2012, the telegraph poles were removed.
By the end of 2013, the Safetran bell was sounding like a cow bell.  Click here and here to listen to that.
By the end of 2014, the Safetran bell was replaced by a GS Type 2.

35
36
Overview facing south.
Overview facing north.
37
38
39
40
41
42
43
44
45
The updated northern signal. The US&S mechanism replaced a Safetran 1980s one in the early to mid 2000s.
46
47
48
49
50
51
52
The updated southern signal. This still retained its original gate mechanism.
53
54
55
56
The relay bungalow in the northeast quadrant.
The grade is all concrete.
Track view facing west towards Jugtown Rd. Track view facing east towards Mazon St.
57
58
59
60
61
62
63
64
65
Action shots from CSX 7686 East.
66
67
68
69
In December 2015, we see the crossbucks and track signs were replaced.   Blue DOT signs were added as well.
70
71
72
73
74
75
76
77
78
79
80
81
In April 2023, we see both the US&S and Safetran gate mechanisms were replaced with new Siemens mechanisms. This happened sometime in 2022.