69.77


175057K

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: NEG E-Bell NEG E-Bell
Base: Siemens 5" Single Sided > Siemens 5" Single Sided >
Lights: 4 - 12"x24" Safetran w/ GE Dotted LEDs 4 - 12"x24" Safetran w/ GE Dotted LEDs
Junction Box: Safetran Safetran
Gate Lights: NEG Clear LEDs NEG Clear LEDs
Gate Mechanism: Siemens Imprinted w/ Old NEG Two Way Saver Siemens Imprinted w/ Old NEG Two Way Saver
Gate Striping: Vertical Striping Vertical Striping


>>>>>>>>>>>> Northern Pedestrian Gate Southern Pedestrian Gate
Base: Siemens 5" Single Sided < Siemens 5" Single Sided >
Gate Light: 4" RECO LED 4" RECO LED
Gate Mechanism: Siemens Imprinted Siemens Imprinted
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-24 were taken on January 21, 2016.
The 1st video was taken on March 17, 2016.
Pictures 25-58 were taken on July 30, 2019.
The 2nd video was taken on July 8, 2020.
Pictures 59-60 and the 3rd video were taken on August 25, 2021.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.

1
2
Overview of 2 gated signals facing south.
Overview facing north.
3 4 5
6 7 8
9 10 11
The northern signal.
12 13 14
15 16 17
18 19 20
The southern signal.
21 22 23 24
The relay bungalow in the southeast quadrant.
The grade is all concrete.
Track view facing west towards Mulford Rd.
Track view facing east at Main St.

In 2018, the crossing was completely overhauled with 2 new signals, plus 2 pedestrian gates.  There's no sidewalk over the crossing yet, but it appears there will be at some point.

25
26
Overview of the new setup facing south.
Overview facing north.
27 28 29
30 31 32
33 34 35 36
The new northern signal.
37 38 39
40 41 42
43 44 45 46
The southern signal.
47 48 49 50
The new northern pedestrian gate.
51 52 53 54
The new southern pedestrian gate.
55 56 57 58
The new relay bungalow in the northeast quadrant.
The grade is all concrete.
Track view facing west towards Mulford Rd.
Track view facing east at Main St.
59
60
In August 2021, we see the sidewalk going over the crossing was finally finished, giving the pedestrian gates some value.