>>>>>>>>>>>>>
Northern Signal
Southern Signal
Bell:GS Type 2 E Bell
None
Base: WCH
WCH
Main Lights: 3 pairs of 12"x20" Dialight LEDs in older Safetran frames
2 pairs of 12"x20" Dialight LEDs in older Safetran frames
Gate Lights: 4" RECO LEDs
4" RECO LEDs
Gate Mechanism: Safetran
Safetran
Gate Striping: Front:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rear:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Front:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||///
Rear:  \\\|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Crossbuck font
Normal font, double sided
Normal font, double sided
Bell Cycle: Rings for the whole duration
N/A

Pictures 1-11 were taken on March 24, 2008.
Pictures 12-27 were taken on July 28, 2011.
Pictures 28-69 and the video were taken on March 14, 2015.
Pictures 70-75 were taken on December 19, 2015.
All photos and video were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights on it as well.

1
2
3
4
5
6
7
8
9
10
11
Photos from March 2008.  At the time, the signals had 12"x20" incandescent lights and 4" RECO incandescent gate lights.

In June 2009, the telegraph poles were taken down.
In early 2010, the 2 furthest gate lights on the northern signal were upgraded to LED.  The closest to the gate mechanism was still incandescent.
In mid 2011, all of the other lights on the crossing were upgraded to LED.

12
13
Overview facing north.
Overview facing south.
14
15
16
17
The southern signal.
18
19
20
21
22
The northern signal.
23
24
25
Track view facing east towards 5th Ave. #2.
Track view facing west at Division St. #2.
The grade is all concrete.
26
27
Action shots.

In 2012 or 2013, the gate striping was updated to the newer block style.

28
29
30
Overview facing north.
Overview facing south.
Overview facing west.
31
32
33
34
35
36
37
38
The southern signal.
39
40
41
42
43
44
45
46
47
48
49
The northern signal.
50
51
52
53
The relay case in the southwest quadrant.
The all concrete grade.
Track view facing west at Division St. #2.
Track view facing east towards 5th Ave. #2.
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
Action shots from BNSF 7444 East.
70
71
72
73
74
75
In December 2015, we see the crossbucks and track signs were replaced.  Blue DOT signs were added as well.