>>>>>>>>>>>>>
Northern Signal
Southern Signal
Bell:None
GS Type 2 E Bell
Base: WCH
WCH
Main Lights: 2 pairs of 12"x20" Dialight LEDs in older Safetran frames
2 pairs of 12"x20" Dialight LEDs in older Safetran frames
Gate Lights: 4" RECO LEDs
4" RECO LEDs
Gate Mechanism: Invensys Rail
Invensys Rail
Gate Striping: Front:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rear:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Front:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rear:  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Crossbuck font
Normal font, double sided
Normal font, double sided
Bell Cycle: N/A
Rings froms startup to when the gates start rising

Pictures 1-8 were taken on March 24, 2008.
Pictures 9-22 were taken on July 28, 2011.
Pictures 23-43 and the video were taken on March 14, 2015.
Pictures 44-47 were taken on December 19, 2015.
All pictures and video were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub, with UP having trackage rights on it as well.

1
2
3
4
5
6
7
8
Photos from March 2008.  At the time, this crossing had 12"x20" incandescent lights and WRRS gate mechanisms.  I believe the gate lights were incandescent as well (the northern ones for sure).

In late 2008, the old relay case seen in Picture 4 was replaced with a new bungalow.  The relay case was taken out in April 2009.  Click here to see a video of the crossing before the new bungalow went in.
In April 2011, all lights were upgraded to LED and the WRRS gate mechanisms were replaced with Invensys Rail ones.  Click here and here to see videos before the new LEDs and gate mechanisms were installed.

9
10
Overview facing south.
Overview facing north.
11
12
13
14
The updated northern signal.
15
16
17
18
The updated southern signal.
19
20
21
22
Track view facing west towards Carbon Hill Rd.
Track view looking east at Broadway St.
The grade is all concrete.
The newer relay bungalow in the southwest quadrant.

In early 2012 I believe, the gate striping was updated to the newer block striping.
In late 2012, the telegraph poles along the line were removed.

23
24
Overview facing south.
Overview looking north.
25
26 27
28 29 30
31
The northern signal.
32
33 34 35
36 37 38
39
The southern signal.
40 41 42 43
The relay bungalow in the southwest quadrant.
The concrete grade.
Track view facing west towards Carbon Hill Rd.
Track view facing east at Broadway St.
44 45 46 47
In December 2015, we see the crossbucks and track signs were replaced.  Blue DOT signs were added as well.