Western Signal
Eastern Signal
Bell:NEG E Bell
NEG E Bell
Base: Siemens
Siemens
Main Lights: 2 pairs of 12"x24" GE Dotted LEDs in Safetran frames
2 pairs of 12"x24" GE Dotted LEDs in Safetran frames
Crossbuck font: Normal font, double sided
Normal font, double sided

Pictures 1-11 were taken on March 24, 2008.
Pictures 12-28 were taken on December 19, 2015.
Pictures 29-42 were taken on November 20, 2017.
Pictures 43-65 were taken on February 8, 2018.
All pictures were taken by Tommy McGowan.
This crossing is located on the UP Pequot Line.

1
2
3
4
5
6
7
8
9
10
11
Photos from March 2008.  Since then, the only changes were the removal of the telegraph poles in 2011 and the addition of blue DOT signs in 2014.
12
13
Overview facing east.
Overview facing west.
14 15 16
17 18 19
The western signal.
20 21 22
23 24 25 26
The eastern signal.
27 28
Track view facing north towards Spring Rd.
Track view facing south towards Braceville Rd. in Braceville.

In 2017, a new logistics center in next to this crossing started being built and will be served by this line.  As such, UP is upgrading this dormant track with new ties and other various track improvements, and also they've upgraded all of the crossings between Braceville and the new facility, including this one.  New gateless signals were installed as well as a new bungalow.

Also, somehow I completely forgot take pictures of one of the signals.  I must've been in a hurry, but I swore I had pictures of it.  I went back in February to get pictures of the other signal, but here's what I got from November first.

29
Overview of the new signals facing west.
30 31 32 33
34 35 36 37
The new eastern signal.
38 39 40 41
The relay bungalow in the northwest quadrant.
The grade is all concrete.
Track view facing north towards Spring Rd.Track view facing south towards Braceville Rd. in Braceville.
42
The new logistics center that is being built.

Here are my photos from February finally getting both signals photographed.

43 44
Overview facing east.
Overview facing west.
45 46 47 48
49 50 51 52
The western signal.
53 54 55 56
57 58 59 60
The eastern signal.
61 62 63 64
The relay bungalow in the northwest quadrant.
The grade is all concrete.
Track view facing north towards Spring Rd.Track view facing south towards Braceville Rd. in Braceville.
65
An update on the logistics center.  Not much has changed.