Pictures 1-22 were taken on December 22, 2010.
Pictures 23-64 were taken on March 16, 2015.
The 1st video was taken on November 25, 2016.
The 2nd video was taken on November 14, 2018.
Pictures 65-89 were taken on August 8, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Joliet Sub.
This massive setup replaced a pair of crossbucks in the early 2000s.
When originally installed, the gates had 4" WCH incandescent lights,
but around 2009 or 2010, they were upgraded to Aurora LEDs.
1
2
Overview of a WCH quad gate setup facing east.
Overview facing west.
3
4
5
6
7
The western entrance signal.
8
9
The western exit signal.
10
11
12
13
14
15
16
The eastern entrance signal.
17
18
The eastern exit signal.
19
20
21
22
The relay bungalow in the northwest quadrant.
The grade is all concrete.
Track view facing north towards Filman Rd. in Gardner.
In 2012, the grade was resurfaced during the 110 mph track upgrade.
Around the same time, the gate holders were replaced.
Sometime in 2014, blue DOT signs were added to the main signals.
23
24
Overview facing east.
Overview facing west.
25
26
27
28
29
30
31
32
33
The western entrance signal.
34
35
36
37
38
39
40
41
42
The western exit signal.
43
44
45
46
47
48
49
50
51
The eastern entrance signal.
52
53
54
55
56
57
58
59
60
The eastern exit signal. All lights on the 4 signals were 1st Gen WCH LEDs, except for 1 Electro-Tech's LED on this signal.
61
62
63
64
The relay bungalow in the northwest quadrant.
The newer concrete grade.
Track view facing north towards Filman Rd. in Gardner.
In August 2024, we see all of the WCH LEDs were replaced with mostly Electro-Tech's LEDs with a few GE Dotted LEDs sprinkled in. The one Electro-Tech's LED from before was likely carried over. All of the gates were also restriped, and the DOT tags were turned forward.
89
The relay bungalow also had its information signs replaced, and a PTC antenna was added.