MP: 14.05

Updated March 2025

Total Accidents:   0
Crossing DOT #:  260623A
TOTAL DAILY TRAINS:  21  (AS OF 2016)

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS Type 2 E-Bell GS Type 2 E-Bell
Base: WCH 5" Single Sided ^ WCH 5" Single Sided ^
Lights: 4 - 12"x24" Harmon w/ 1st Gen Harmon Dotted LEDs 4 - 12"x24" Harmon w/ 1st Gen Harmon Dotted LEDs
Junction Box: Harmon Harmon
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: US&S Model 95 Style 1 w/ Standard Mount US&S Model 95 Style 1 w/ Standard Mount
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-24 were taken on March 19, 2015.
Pictures 25-28 were taken on February 7, 2017.
The 1st video was taken on December 23, 2018.
The 2nd video was taken on April 26, 2019.
The 3rd video was taken on January 23, 2025.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the CN Matteson Sub, formerly the EJ&E Eastern Sub.

1
2
Overview of 2 early 2000s EJ&E gated signals facing south.
Overview facing north.
3 4 5
6 7 8
9 10 11
The northern signal.
12 13 14
15 16 17
18 19 20
The southern signal.
21 22 23 24
The relay bungalow in the northwest quadrant.
The grade is all rubber.
Track view facing west towards Wolf Rd.
Track view facing east towards Sauk Trail.
25 26 27 28
In February 2017, we see the DOT signs were moved down the signals a little bit, and the gates were restriped with the newer style.

By late 2018, the DOT signs were turned forward.