180.95


532539V

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS E-Bell None
Base: Siemens 5" Double Sided ^ Siemens 5" Double Sided ^
Lights: 4 - 12"x20" Safetran w/ GE Uniform Look LEDs 4 - 12"x20" Safetran w/ GE Uniform Look LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO 4" RECO
Gate Mechanism: Siemens Imprinted w/ NEG 1 Way Saver Siemens Imprinted w/ NEG 1 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-21 were taken on February 5, 2016.
Pictures 22-26 were taken on November 17, 2016.
The video was taken on August 4, 2023.
Pictures 27-37 were taken on April 7, 2024.
Pictures 38-56 were taken on April 27, 2024.
Picture 57 was taken on May 7, 2024.
Pictures 58-88 were taken on May 31, 2024.
All pictures and video were taken by Tommy McGowan.
This crossing is located on the NS Kankakee District.
1 2
Overview of 2 Conrail gateless signals facing north.
Overview facing south.
3
4 5
6 7 8 9
The southern signal. Both signals had MI bases and 12"x24" Safetran incandescents with no bells.
10 11 12
13 14 15 16
The northern signal.
17 18 19 20
The relay case in the northwest quadrant.
The grade is wood and asphalt.
Track view facing west towards Main St.
Track view facing east at IL 71.
21
I think we may need a ballast spreader here.
22 23
24 25 26
In November 2016, we see the DOT signs were turned to face foward.  The grade was resurfaced with rubber and asphalt as well, which explains what all the ballast was for.
27 28
29 30 31
32 33 34
35 36 37
In April 2024, we see work had begun to replace the signals here. New signals were off to the side, but a new bungalow hadn't yet arrived. I'm not sure where the bungalow in Picture 37 came from, because it's not from IL 71.
38 39
40 41 42
43 44 45
46 47 48
49 50 51 52
53 54 55 56
By April 27th, the new bungalow was in place and the new foundations were installed. The new northern signal would be placed further to the right protecting the sidewalk.
57
By May 7th, the new signals were installed and activated. The old relay case hadn't yet been removed. NS was still working here, so I didn't get closeups at this point. I returned May 31st to get full pictures.
58 59
Overview of the finished install facing north. Overview facing south.
60 61 62
63 64 65 66
67 68 69 70
The new southern signal.
71 72 73 74
75 76 77 78
79 80 81 82
The new northern signal.
83 84 85 86
The new relay bungalow in the northeast quadrant.
The grade is rubber and asphalt.
Track view facing west towards Main St.
Track view facing east at IL 71.
87 88
The old relay case was set aside next to the unknown relay bungalow. The area where the old northern signal sat was patched over with asphalt.