Pictures 1-25 were taken on November 17, 2016.
Pictures 26-36 and the video were taken on January 9, 2023.
Pictures 37-50 were
taken on April 28, 2023.
Pictures 51-54 were taken on May 2, 2023.
Pictures 55-81 were taken on May 28, 2023.
All pictures
and video were taken by Tommy McGowan.
This crossing is located on the IAIS Peoria Branch.
1
2
Overview of 2 gated signals facing west.
Overview facing east.
3
4
5
6
7
8
9
10
11
The eastern signal. Both signals had Safetran bases, 12"x24" Safetran incandescents, 4" RECO LEDs, and Safetran 2000s gate mechanisms.
12
13
14
15
16
17
18
19
20
21
The western signal. This had a GS Type 1 E-Bell at the time.
In January 2023, we see the GS Type 1 was very surprisingly replaced by a WRRS Mechanical Bell! However, this crossing is also in the process of receiving new signals. Conduit was seen all around the crossing, but no new bungalow was seen yet.
37
38
39
40
41
42
43
44
45
46
47
48
49
50
On April 28th, we see work had progressed quite a bit. The new foundations and relay bungalow were in place and the new signals were being assembled just west of the crossing. Like with all new IAIS installs in 2023 and 2022, this had a WCH Mechanical Bell.
51
52
53
54
Just a few days later on May 2nd, we see the new signals had been installed and activated. The old signals plus the old relay case were already on a trailer ready to be taken away. IAIS was still working here so I wasn't able to get closeup shots yet until May 28th.