Pictures 1-9 were taken on November 16, 2008.
Pictures 10-16 were taken on August 11, 2011.
The 1st video was taken on July 26, 2012.
Pictures 17-44 were taken on December 13, 2014.
Pictures 45-51 were taken on February 20, 2016.
The 2nd video was taken on January 6, 2015.
The 3rd video was taken on November 17, 2016.
The 4th video was taken on April 1, 2020
Pictures 52-70 and the 5th video were taken on October 6, 2020.
The 6th video was taken on February 27, 2021.
The 7th video was taken on April 29, 2021.
The 8th video was taken on September 2, 2022.
All photos and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights on it as well.
1
Overview of 2 gated signals facing south.
2
3
4
5
The northern signal. At the time, this had 12"x20" GS LEDs in Safetran frames.
At the time of the above pictures, the
southern gate had 4" RECO LEDs and the northern gate had two 4" RECO
LEDs and one 4" RECO incandescent (it was the one closest to the gate
mechanism). Originally, this crossing had Aurora LED gate
lights. The northern signal had its replaced first in 2005 or
2006, and the southern in 2007. Also, when I took these pictures,
the crossing had just been resurfaced during a track upgrade.
These signals replaced a pair of older gated signals that had 12"x20"
incandescent lights and a WRRS or WCH mechanical bell.
In June 2009, the telegraph poles were removed. At the same time,
the gate on the northern signal was replaced and thus now all gate
lights are 4" RECO LED.
Sometime in early 2011, the gates were restriped with the newer block striping.
10
11
Overview facing south.
Overview facing north.
12
13
The northern signal with its newer gate striping.
14
15
16
The southern signal with its newer gate striping.
The crossing was resurfaced again in September 2012.
Sometime in 2013, the northern gate was replaced again, but with older
striping! I didn't get any pictures of this change, but this video taken by me from March 11, 2014, shows it at the very beginning.
In 2014, the gate was once again changed back to the block striping and
the GS LEDs were replaced by Dialight LEDs. And once again, the
crossing was resurfaced during another track upgrade.
Sometime in late 2014, both crossbucks were replaced.
In February 2016, we
see that blue DOT signs were added to both signals, the both sets of
crossbucks and track signs were replaced, and the GS Type 2 is now a GS Type 3.
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
In October 2020, we see the gate mechanisms and gates were replaced with new Siemens S-60s. The old gate mechanism from the northern signal was relocated to a mast standing just west of the crossing that is used as a backup in case a signal gets taken out at a crossing. The old gates were also next to the mast.
The new gates feature 4" NEG LED gate lights, which is a 1st for BNSF in this area. The other gate mechanism was relocated to Hadden Rd.