Pictures 1-23 were taken on December 9, 2014.
The 1st video was taken on January 21, 2015.
Pictures 24-27 were taken on February 23, 2016.
Picture 28 was taken on May 4, 2021.
The 2nd video was taken on July 31, 2023.
All photos and videos were taken by Tommy McGowan.
This crossing is located on the CSX New Rock Sub with IAIS having trackage rights on it as well.
Track view looking east towards Nettle School Rd. in Morris. The track that goes off to the right leads to the Canal Tow Path crossing and the Orica plant.
24
25
26
27
In February 2016, we see the white DOT signs were replaced with blue ones.
28
In May 2021, we see a PTC antenna was added to the bungalow.
This crossing has been through many
changes in the past several years. This crossing used to have 2 older
signals with 12"x24" incandescent lights, WRRS gate mechanisms, and a
WRRS mechanical bell.
Then in 2009, they were replaced by a set of newer Safetran signals
that also had incandescent lights and a Safetran type 2 E-Bell on the
top of the northern signal. In 2010, they were upgraded to LED
lights.
In October 2010, the crossing was resurfaced from an all rubber grade to an all concrete grade during a track upgrade.
Between April 2011 and January 2012, the newer signals were replaced by
the signals in these pictures for whatever reason, and the new bungalow
was installed as well, replacing the older 1990's bungalow in the
southwest quadrant. I have no idea why the other signals were
replaced, since they were basically brand new.