Pictures 1-4 were taken on July 13, 2011.
Pictures 5-25 were taken on August 11, 2011.
Pictures 26-61 and the 1st video were taken on December 13, 2014.
Pictures 62-65 were taken on December 14, 2015.
The 2nd video was taken on
February 3, 2021.
Pictures 66-79 and the 3rd video were taken on July 23,
2021.
The 4th video was taken on September 8, 2022.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights on it as well.
This crossing received the LED lights
and the current relay bungalow in late 2008. It's unknown when the US&S gate mechanism was installed, but it was
probably around the same time and most likely replaced an older
Safetran mechanism like the other signal. The old telegraph poles
that were along the tracks at this crossing were taken out in early
2009.
In 2013, both gate mechanisms were
replaced with Invensys Rail ones.
The US&S one was moved to Airport Rd. to replace an old FS/WCH one
there. The other signal on that crossing had a US&S gate mech
already so it made sense to make both sides the same kind of
mechanism. The crossbucks and track signs were replaced as well,
and the RACO base on the eastern signal was changed to a Safetran.
In early to mid 2021, the western signal was replaced with a brand new Siemens signal.