Western Main Signal
Western Exit Signal Eastern Main Signal
Eastern Exit Signal
Bell:WCH Type 2 E Bell
WCH Type 2 E Bell
WCH Type 2 E Bell
NEG E Bell
Base: Progess Rail Cantilever
WCH Double Sided
Progress Rail Cantilever
WCH Double Sided
Main Lights: 4 pairs of 12"x24" GE Dotted LEDs in WCH frames
1 pair of 12"x24" GE Dotted LEDs in Safetran frames
1 pair of 12"x24" 2nd Gen WCH LEDs in Safetran frames

4 pairs of 12"x24" GE Dotted LEDs in WCH framesThree 12"x24" GE Dotted LEDs in Safetran frames
One 12"x24" 2nd Gen WCH LED in a Safetran frame

Light Brackets:
Progress
Safetran
Progress
Safetran
Gate Lights: Aurora LEDs
Aurora LEDs Aurora LEDs
Aurora LEDs
Gate Mechanism: WCH
Siemens
WCH
Siemens
Gate Striping: |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Crossbuck font
Normal font, double sided
Normal font, double sided Normal font, double sided
Normal font, double sided
Bell Cycle: Rings for the whole duration
Rings for the whole duration Rings for the whole duration Rings for the whole duration

Pictures 1-21 were taken on December 18, 2010.
Pictures 22-45 were taken on March 14, 2015.
Pictures 46-58 and the 1st video were taken on December 19, 2015.
Pictures 59-72 and the 2nd video were taken on November 22, 2017.
Picture 73 was taken on February 5, 2018.
Pictures 74-82 and the 3rd video were taken on February 6, 2018.
Pictures 83-112 were taken on February 8, 2018.
Pictures 113-142 and the 5th video were taken on April 4, 2018.
Pictures 143-151 were taken on December 25, 2018.
The 4th video was taken on March 13, 2018.
The 6th video was taken on November 14, 2018.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Joliet Sub.

1
2
Overview of 2 WCH gated signals facing east.
Overview facing west.
3
4
5
6
7
8
The western signal.  This had a WCH Type 1.5 E Bell at the time.
9
10
11
12
13
14
15
The eastern signal.  This had a dead GS E bell at the time.
16
17
18
19
The grade is all concrete.
Track view facing north towards Ordnance Crossing in Elwood.
Track view facing south towards Kankakee River Dr.
The relay bungalow in the southeast quadrant.
20
21
Action shots.  Click here to see the video of this train.

By 2011, the GS E Bell was replaced with a WCH E Bell.  At some point also, the WCH Type 1.5 was replaced with a Type 2.
In 2012, the gate holders were replaced with new ones, and the grade was resurfaced during the 110 mph track upgrade.
At some other point between 2010 and 2015, the western gate and part of the eastern gate was replaced.

22
23
Overview facing east.
Overview facing west.
24 25 26
27 28 29
30 31 32
The western signal.
33 34 35
36 37 38
39 40 41
The eastern signal.
42 43 44 45
The relay bungalow in the southeast quadrant.
The grade is all concrete.
Track view facing north towards Ordnance Crossing in Elwood.Track view facing south towards Kankakee River Dr.

On June 5, 2015, Amtrak 22, the NB Texas Eagle, with the Phase II heritage unit #66, struck a tractor trailer full of bacon and made national news.  In the process, the truck destroyed the eastern signal and the gate on the western signal, and since this line will most likely be double tracked soon, they chose not to install a brand new signal, and put together a signal from parts.  The gate mechanism is new, the gate is new, and the bell might be new, but I'm not sure, but the lights and crossbuck are older.  In fact, I found out the lights were the old lights on the eastern signal from Ordnance Crossing in Elwood after the old signals there had been recently replaced.

46 47
Overview of the updated look facing east.
Overview facing west.
48 49 50
51 52 53 54
55 56 57
58
The "new" eastern signal.

By fall 2017, work was underway to make this crossing quad gated.  New exit signals were erected, but without lights or gates.  It appeared they were going to add these signals on to the existing setup, which confused me as I figured this crossing would be double tracked.  Also at some point between 2015 and 2017, one of the western signal's WCH LEDs was replaced by an Electro-Tech's LED.

59 60 61
Overview of the updated setup facing east.
Overview facing west.
The new Electro-Tech's LED on the western signal, plus the right light has become a little lopsided.
62 63
64 65 66
The new western exit signal.
67 68
69 70 71
The new eastern exit signal.
72
A new relay bungalow was installed behind the old one.

By early February, I noticed it was taking quite a while for UP to install gates on the new exit signals.  Lights were on them, but no gates yet.  I drove by on February 5th and noticed that they were just installing the exit signals here, but also new main signals, and that they were going to be cantilevers!  What's even weirder is that even with the new signals being installed, at some point, the old western signal received new LEDs!  They were 12"x24" GE Dotted LEDs in Safetran frames.  I have no idea why they were installed with the signal coming out soon, but it's one of those things that I'll probably never solve.

73
UP gangs working on the new cantilever on February 5th.  Note the new LEDs on the old western signal.

On February 6th I made another comeback hoping to get closeups of the new LEDs on the old western signal before it was too late, and got a big shock, as I managed to catch the transition between the old and new signals!  I didn't get a whole lot of photos, and I didn't get up close, as I didn't want to appear nosey around the UP workers, but I did get a video down below of them removing the old signal.  Weirdest thing was that they actually reused the same WCH bell off the old signal for the new one.  Very rare to see that.  They also reused the same gate.

74 75 76
77 78 79
80 81 82
Photos of the transition.  One niceUP worker did come down and talk to me, and he was telling me about how the original plan was just to install the exit signals, but midway through, their minds changed and the new cantilevers were installed as well.  He said the exit gates weren't installed yet because they had to rework them or something.  I forgot to ask about the future double track and why this crossing wasn't set up for it.

By February 8th, work was halted, so I made a return to get closeup photos.

83 84
Overview of the updated setup facing east.
Overview looking west.
85 86 87
88 89 90
91 92 93
The brand new western main signal.
94 95
96 97 98
The western exit signal with its new lights.
99 100
101 102 103
The eastern exit signal with its new lights.
104 105 106
107 108 109
110 111 112
Photos of several parts sitting around, including what remains of the old western signal including the replacement lights which couldn't have been used for any more than 2 months.  Note the old base still in place, as well as the lights sitting behind the pair of relay bungalows.

Sometime between February 21st and March 13th, the eastern signal was replaced with a new cantilever, and the western cantilever was completed.  Oddly enough, the replacement GE Dotted LEDs that the old western signal had were not reused as all of the lights on the new cantilevers have WCH frames and not Safetran ones.  I have no idea where the other GE LEDs ended up at.

113 114
Overview of the updated setup facing east.
Overview facing west.
115 116 117 118
119 120 121 122
123 124 125 126
The fully completed western main signal.
127 128 129 130
131 132 133 134
135 136 137 138
The new eastern main signal.  The DOT sign was transferred over, and some how has already been beat to hell.
139 140 141 142
The old and new relay bungalows in the southeast quadrand.
The concrete grade.
Track view facing north towards Ordnance Crossing in Elwood.Track view facing south towards Kankakee River Dr.

Later in 2018, the old relay bungalow was removed, and the exit signals finally received gates.

143 144
Overview of the finished setup facing east.
Overview facing west.
145 146 147
The updated western exit signal.
148 149 150
The updated eastern exit signal.
151
The grade was resurfaced once again.