Pictures 1-31 were taken on June 13, 2015, by Tommy McGowan.
The 1st video was taken on September 23, 2015, by Tommy McGowan.
Pictures 32-43 were taken on November 5, 2016, by Tommy McGowan.
The 2nd video was taken on June 3, 2024, by Norfolk Southern Railfan.
The 3rd video was taken on August 12, 2024, by Nicholas Miles.
The 4th video was taken on October 12, 2025, by Norfolk Southern Railfan.
Pictures 44-83 were taken on November 5, 2025, by Nicholas Miles. This crossing is located on the NS Toledo District.
1
2
Overview of 2 older cantilevers facing west.
Overview facing east.
3
4
5
6
7
8
9
10
11
12
13
14
The
western signal. This signal all RACO incandescents, a GS Type 2 E-Bell,
an 80s Safetran gate mechanism, and RECO incandescents.
15
16
17
18
19
20
21
22
23
24
25
26
27
The eastern signal.
This had nearly the same equipment as the western signal, but had NEG
incandescents and a early 70s Safetran gate mechanism.
In November 2016, we
see the DOT signs were turned to face forward, and the end of the
western gate was replaced. Also, the wayside signal next to the
crossing is being replaced, even though it's less than 10 years
old. Subsequently, the relay bungalow will be replaced as
well. I also included a couple shots of the bridge next to the
crossing.
JANUARY 2026 UPDATE: Sir Fluent here. In 2024, both signals were replaced with newer gated cantilever signals.