>>>>>>>>>>>>>
Northern Signal
Southern Signal
Bell:Safetran Mechanical Bell
Safetran Mechanical Bell
Base: Safetran
Safetran
Main Lights: 2 pairs of 12"x24" Safetran incandescents
2 pairs of 12"x24" Safetran incandescents
Gate Lights: 4" RECO incandescents
4" RECO incandescents
Gate Mechanism: Safetran
Safetran
Gate Striping: Front:  /////////////////////////////////////////////////////////////
Rear:  \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
/////////////////////////////////////////////////////
Crossbuck font
Normal font
Normal font
Bell Cycle: Rings only while the gates are lowering
Rings only while the gates are lowering

Pictures 1-26 were taken on October 15, 2015.
Pictures 27-30 were taken on September 5, 2017.
The video was taken on October 29, 2015.
This crossing is located on the W&LE Hartland Sub.

1
2
Overview of 2 gated signals facing north.
Overview facing south.
3 4 5
6 7 8
9 10 11
12
The southern signal.
13 14 15
16 17 18
19 20 21
22
The northern signal.
23 24 25 26
The relay bungalow in the northwest quadrant.
The grade is wood and asphalt.
Track view facing east towards West St. in Norwalk.
Track view facing west towards Main St.
27 28 29 30
In September 2017, we see the DOT signs were replaced.