Pictures 1-25 and the 1st video were taken on September 21, 2016, by Tommy McGowan.
The 2nd video was taken on November 30, 2023, by Nicholas Miles/Northwestern Ohio Rail Productions.
The 3rd video was taken on October 3, 2024, by Nicholas Miles/Northwestern Ohio Rail Productions.
Pictures 26-67 were taken on October 15, 2025, by Nicholas Miles/Northwestern Ohio Rail Productions.
This crossing is located on the CSX Willard Sub.
1
2
Overview of 2 gated signals facing south.
Overview facing north.
3
4
5
6
7
8
9
10
11
The
northern signal. Not sure how it got 3 different manufacturers of
lights. This had a mix of 12"x24" incandescents, 2 MI, 1 Safetran and 1
Hawker Safetran. It also had RECO LEDs and a Safetran gate mechanism.
12
13
14
15
16
17
18
19
20
21
The southern
signal. These lights all appear new. These were all 12"x24"
Safetran incandescents, and the signal also featured a WCH Mechanical
Bell, Safetran gate mechanism and RECO LEDs.
NOVEMBER 2025 UPDATE: Sir Fluent here. Since Tommy was last out here, Tiffin became a quiet zone around 2021 and as a
result, both signals were replaced with a quad-gated setup.
26
27
Overview of the new setup facing south.
Overview facing north.
28
29
30
31
32
33
34
35
36
37
The new northern main signal.
38
39
40
41
42
43
44
45
46
47
The new southern main signal. Strangely,
this is the only signal at this crossing to feature an actual gate saver
as the rest of the signals just use standard mounts.