WCH Mechanical Bell Pack
=================================
1. Description / Requirements
2. Installation
3. Technical / Contact Info
4. Credits
=================================

1.1 Contained is RRXingRicks WCH Mechanical Bells.
1.2 Contains standard 2 base version (as pictured), 5" one base version, & 4" one base version.
=================================

2.1 Extract the folders to which ever route you want them to be in.
2.2 Copy the text in the .REF file into your routes .REF file. This is vital for them to be seen or used in Route Editor.
2.3 After this they should be good to go.

=================================

3. For any errors caused by or noticed on the bells, send me an email at caltrain927@yahoo.com

=================================

4. Everything is the content of Patrick Lopez (RRXingRick).

Ben Margherone 2009