Pictures 1-29 were taken by BNSFman08.

 

1

2

3

This crossing has 5 pairs of older Safetran 12"x20" incandescent lights with at least one WABCO gate mechanism.

 

Note that the road is blocked off... I've read that the whole crossing is going to be torn out (as what the city of Peoria seems to be doing to BNSF lately), and widened for an upcoming Wal-Mart Supercenter project.

 

Pictures 1-3 were taken March 25, 2008.

 

4

5

6

Facing South at an oncoming train.

A look at the other signal with a DERAIL sign.
This gate mechanism is also WABCO.

7

8

9

A look at one of the WABCO logos.
A look at one of the six 7" gate lights at this crossing. The light maker is unknown.
All lights here are Safetran 12"x20" incandescents.

10

11

12

The train is getting closer.
The signals activate.
A closeup of the 7" gate light.

13

14

15

A look at the other signal nearest to US 60.
The train crosses.
Facing North.

16

17

18

Still facing North.
The front lights of the signals have two different Safetran logos...
Facing South again.

19

20

21

A peek at the other signal.
The gates rise.
Facing North towards 83rd Ave. and Peoria Ave.

 

Both GS electronic bells are type 2, and they ring from activation to deactivation.

 

Note: You can see a Whistle Post in picture 21 with a "2" underneath it. That's means that there's 2 crossings coming up.

Pictures 4-21 were taken on March 30, 2008.

 

22

On May 25, 2008, the rest of the street, along with the signals were all torn out. Nothing of the old installation exists anymore.

 

According to the City of Peoria's website, this is what they have to say about the construction progress:

 

"9C Agreement, Burlington Northern Santa Fe Railroad, Grade Crossing Signal Installation, 81st Avenue PASSED Discussion and possible action to: a) Authorize the City Manager to enter into a Grade Crossing Signal Installation Agreement with the Burlington Northern Santa Fe (BNSF) Railroad to expand the existing 81st Avenue BNSF Railroad roadway crossing (future Cotton Crossing) to include provisions for the roadway widening required as part of the roadway improvements included in the Phase II portion of the Wal-Mart Retail Center (LCON08307); and b) Authorize payment to BNSF Railroad for the necessary improvements associated with completing the City’s obligations contained in the agreement. "

 

Once again, Wal-Mart interfers with old crossings...

 

23

24

25

Work is still progressing at the crossing on November 16, 2009. The grades have been reinstalled again, which replaced the old wooden grades.

Note in picture 25 how much wider the grades are than the old street entrance. Perhaps this will have median signals when the time comes to reopen the crossing?

26

27

More views from the other side of the crossing on the US 60 (Grand Avenue) side.

 

28

29

A return trip on February 13, 2010 shows something quite unexpected... At least one part of the crossing will have a bridge cantilever!

In picture 29, you can get a look at what'll be on it, which appears to be 12"x24" frames from Safetran. There's also a new relay case up as well.

 

30

31

32

A look at the 81st Ave. crossing from the 83rd Ave. crossing with a train about to cross.

A look at where another cantilever will eventually be at.
Here's the bridge cantilever with the 12"x24" frames removed for some reason.

 

There's only one GS bell (likely type 2) that's shown in these pictures, although I'm sure there are two here. Note all the masts and gates that are here. This is going to be one HUGE crossing when this opens.

 

Pictures 30-32 were taken by IllinoisTrains on March 7, 2010.

 

33

34

35

On March 22, 2010, we see some more lights going up. All are 12"x24" of course. There are at least 3 GS bells that can be seen from these views. No gates or crossbucks have been installed yet.

36

37

38

8 pairs of 12"x24" frames are on the bridge cantilever. Six in front, and 2 for the rear.

Nearly an identical view to picture 34.
An overview.

 

Pictures 33-38 were taken by BNSFman08.

 

39

40

On April 18, 2010, the crossing looks like it's almost finished. Looks like it may not be long now...

Pictures 39 and 40 were taken by IllinoisTrains.