| Yes, I did get a train through here. I was too late however to get video from here. This crossing used to be just mast with gates in the past. Pictures were taken September 21, 2003. |
|
Hardly any change to the crossing as shown on March 7, 2008 by BNSFman08.
All Safetran 12"x20" lights are incandescent. |
|||
A couple extra views of the crossing including a slightly leaning gate in picture 8.
These 3 pictures were taken on March 25, 2008. |
||
A big change to the crossing was found on February 6, 2010. Apparently the city of Surprise decided that the old way the intersection wasn't good enough, so they're tearing things up, and giving the crossing a major overkill in the process.
|
||
The mast signal shown in pictures 13 and 14 is temporary since the second half of the street isn't complete yet. Once it is done, I'm sure there will be either be 3 or 4 cantilevers, probably similar to Bell Road. Both bells on the gates are from GS, and are likely type 2 e-bells.
The cost for this upgrade so far has reached $2,641,000 for the entire project. Likely half or a little more than half of the project money was due to the signals alone. |
||
For more information, click here: http://pubapps.surpriseaz.com/cip/cipdetail.aspx?pn=20509