|
|
|
|
|
|
|
|
|
|
These two pictures were taken by dfhydydfdfddfhyd@aol.com sometime in 2004. The crossing was under construction due to Metrolink coming in. You can see the remains of the one old signal in both pictures with a RACO or Griswold mechanical bell.
You can see how the three new signals are much higher in height than the other signal, which is a bit weird for its time. Note in picture 1 how the median signal's gate is pointing the wrong way... At first I thought it was a temporary mistake, but thanks to Google Street View, the reasoning for the gates has been explained, and the crossing has dramatically changed.
|
|