MP:  121.317?

 

Created November 25, 2021

 

Total Accidents:   1
Crossing DOT #:  805314X
TOTAL DAILY TRAINS:   12   (ESTIMATED)

 

Page created by: PlyingKibbles89


This crossing is located on the BNSF Angora Subdivision.


>>>>>>>>>>>>> Southern Signal
Northern Signal
Bell: General Signals Electronic General Signals Electronic
Base: Siemens Siemens
Light Frames: 4 - Safetran 12x24 inch with Dialight Ball LEDs 4 - Safetran 12x24 inch with Dialight Ball LEDs
Gate Lights: 3 - RECO 3 - RECO
Gate Mechanism: Siemens Imprinted Siemens Imprinted
Gate Striping: Vertical Vertical

 

1

2

3

4

Overview of the crossing.
The southern signal.

5

6

7

8

It has a Safetran base.
A Safetran gate mechanism.
The emergency info.
The lights here are...

9

10

11

12

...Safetran 12x24 inch lights with WCH 2nd Gen LEDs.
There is an NEG electronic bell on the side.
This signal uses Alstom LED gate lights.

13

14

15

16

The northern signal.
It also has a Safetran base.
Another Safetran gate mechanism.

17

18

19

20

The emergency info.
The lights over here are more Safetran 12x24 inch lights with WCH 2nd Gen LEDs.

21

22

23

24

This signal also has an NEG electronic bell.
This signal also uses Alstom LED gate lights.
Track view looking west towards CR 16.
Track view looking east towards Private Crossing #3.

25

26

27

28

The relay case.
A random private crossing sign near the crossing.
The crossing activates!

29

30

Unfortunately, my camera that I used to record this crossing ran out of storage, so I had to use the camera I use to take pictures with.

31

32

33

A return trip on 03-24-22 catches the crossing in action again.

34

A return trip on 10-21-23 shows a major change to the crossing.

35

36

BNSF ENS signs were added to both signals. BNSF bought this part of the Julesburg Sub from UP.

37

38

39

This crossing is also in the process of being replaced. New foundations are already installed. Honestly seems like a waste to replace these 2010's era signals. A new relay case was also installed behind the old one. A signal maintainer was working here at the time.

40

41

Another return trip on 12-31-23 shows the new signals installed and activated.

42

43

44

45

46

47

48

49

50

51

The new northern signal.

52

53

54

55

56

57

58

59

60

61

The new southern signal.

62

63

64

Track views. The new relay case, now fully active.



Pictures 1-30 and the first video were taken on 03-26-21.
Pictures 31-33 and the second video were taken on 03-24-22.
Pictures 34-39 were taken on 10-21-23.
Pictures 40-64 were taken on 12-31-23.