| >>>>>>>>>>>>>>> | Western Entrance Signal | Western Exit Signal | Eastern Entrance Signal | Eastern Exit Signal |
| Bell: | NEG E-Bell | NEG E-Bell | NEG E-Bell | NEG E-Bell |
| Cantilever: | Lindsay Rail Cantilever | None | Lindsay Rail Cantilever | None |
| Mast Base: | Siemens 5" Double Sided ^ | Siemens 5" Double Sided ^ | Siemens 5" Double Sided ^ | Siemens 5" Double Sided ^ |
| Lights: | 6 - 12"x24" Harmon w/ GE Dotted LEDs 2 - 12"x24" Safetran w/ GE Dotted LEDs |
4 - 12"x24" Safetran w/ GE Dotted LEDs | 6 - 12"x24" Harmon w/ GE Dotted LEDs 2 - 12"x24" Safetran w/ GE Dotted LEDs |
4 - 12"x24" Safetran w/ GE Dotted LEDs |
| Junction Box: | 2 Harmon, 1 Safetran | Safetran | 2 Harmon, 1 Safetran | Safetran |
| Gate Lights: | NEG Clear LEDs | NEG Clear LEDs | NEG Clear LEDs | NEG Clear LEDs |
| Gate Mechanism: | Siemens Sticker Style 2 w/ Old NEG 2 Way Saver | Siemens Sticker Style 2 w/ Standard Mount | Siemens Sticker Style 2 w/ Old NEG 2 Way Saver | Siemens Sticker Style 2 w/ Standard Mount |
| Gate Striping: | Vertical Striping | Vertical Striping | Vertical Striping | Vertical Striping |
| >>>>>>>>>>>> | Western Pedestrian Gate | Eastern Pedestrian Gate |
| Base: | WCH 5" Single Sided ^ | WCH 5" Single Sided ^ |
| Gate Light: | 4" RECO | 4" RECO |
| Gate Mechanism: | WCH Style 4 | WCH Style 4 |
| Gate Striping: | Diagonal Striping | Diagonal Striping |
G1![]() |
G2![]() |
G3![]() |
G4![]() |
| Google Streetview pictures from 2015 showing two older Safetran gated cantilevers with 12"x24" LEDs (likely WCH) and WCH Mechanical Bells. At the time, you can see both the crossing and diamond had old and newer bungalows at them. However, you can see conduit all around the area, so even the newer bungalows were soon to be replaced. In fact, in 2016, satellite imagery shows that the newest bungalow for the diamond had been installed, and the previous one and the one it had replaced were still in place, making 3 bungalows that were intended for the same purpose in the same place at the same time! By 2017, the crossing cantilevers were replaced with a brand new quad gated setup with cantilevers and pedestrian gates. |
| 1 |
2 |
| Overview of the newer setup facing west. | Overview facing east. |
| 3 |
4 |
5 |
| 6 |
7 |
8 |
| 9 |
10 |
11 |
12 |
| 13 |
14 |
15 |
16 |
| The western entrnace signal. |
| 17 |
18 |
19 |
| 20 |
21 |
22 |
| 23 |
24 |
25 |
26 |
| 27 |
28 |
29 |
30 |
| The eastern entrance signal. |
| 31 |
32 |
33 |
| 34 |
35 |
36 |
| 37 |
38 |
39 |
| The western exit signal. |
| 40 |
41 |
42 |
| 43 |
44 |
45 |
| 46 |
47 |
48 |
| The eastern exit signal. |
| 49 |
50 |
51 |
52 |
| The western pedestrian gate. |
| 53 |
54 |
55 |
56 |
| The eastern pedestrian gate. |
| 57 |
58 |
59 |
60 |
| The relay bungalow in the southeast quadrant which is shared with Washington St. #2 and #3. | The grade is all concrete. | Track view facing north towards University St. in Normal. | Track view facing south towards Miller St. |
| 61 |
| The newest bungalow for the diamonds. |