33.21


689692X

>>>>>>>>>>>>>> Eastern Shoulder Signal Eastern Median Signal Western Signal
Bell: Siemens E-Bell Low Tone N/A N/A
Cantilever: Safetran Cantilever Safetran Cantilever Safetran Cantilever
Light Brackets: 3 - Safetran 3 - Safetran 3 - Safetran
Lights: 8 - 12"x24" Safetran w/ GE Uniform Look LEDs 8 - 12"x24" Safetran w/ GE Uniform Look LEDs 8 - 12"x24" Safetran w/ GE Uniform Look LEDs
Gate Lights: 3 - RECO 4" LEDs 3 - RECO 4" LEDs 3 - RECO 4" LEDs
Gate Mechanism: WCH Style 4 w/ WCH Gate Saver WCH Style 4 w/ WCH Gate Saver WCH Style 4 w/ WCH Gate Saver
Gate Striping: Vertical Striping Vertical Striping Vertical Striping


>>>>>>>>>>>>>> Eastern Pedestrian Signal Western Pedestrian Signal
Bell: Siemens E-Bell Low Tone Siemens E-Bell Low Tone
Base: Siemens 5" Single Sided Siemens 5" Single Sided
Light Brackets: Safetran Safetran
Lights: 2 - 12"x24" Safetran w/ GE Uniform Look LEDs 2 - 12"x24" Safetran w/ GE Uniform Look LEDs
Gate Lights: 1 - RECO 4" LEDs 1 - RECO 4" LEDs
Gate Mechanism: WCH Style 4 WCH Style 4
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-62 were taken on February 22, 2026, by Rus.
The video was taken on March 25, 2026, by Rus.
This crossing is located on the CN Waukesha Sub or Metra North Central Service.
Page created by Rus (using HopenRXRTools 1.3.0).

SV1
Street view from September 2012 shows 2 IC era gated signals with 1 bell.
SV2
By October 2018, both signals were replaced with newer Siemens signals. The grade was also lengthened to the south. But by 2021, the crossing was completely overhauled with 3 gated cantilevers and 2 pedestrian gates.
1
2
Overview of the updated setup facing east.Overview facing west.
3 4
5 6 7
8 9 10 11
12 13 14 15
The eastern shoulder signal.
16 17 18
19 20 21
22 23 24 25
The eastern median signal.
26 27 28 29
30 31 32 33
34 35 36 37
The western signal.
38 39 40
41 42 43
44 45 46
The eastern pedestrian signal.
47 48 49
50 51 52
53 54 55
The western pedestrian signal.
56
57
58
59
The newer relay bungalow in the northwest quadrant.The grade is all concrete. Obviously, the lengthened grade now accommodates the new sidewalk built here.Track view facing north towards Half Day Rd.Track view facing south towards Deerfield Pkwy.
60 61 62
Miscellaneous stuff around the crossing.