Western Entrance Signal
Western Exit Signal
Eastern Entrance Signal
Eastern Exit Signal
Bell:
WCH Type 1.5 E-Bell
WCH Type 1.5 E-Bell
WCH Type 1.5 E-Bell
WCH Type 1.5 E-Bell
Base:
WCH 5" Single Sided ^
WCH 5" Single Sided ^
WCH 5" Single Sided ^
WCH 5" Single Sided ^
Lights:
6 - 12"x24" WCH w/ 1st Gen WCH LEDs
4 - 12"x24" WCH w/ 1st Gen WCH LEDs
4 - 12"x24" WCH w/ 1st Gen WCH LEDs
4 - 12"x24" WCH w/ 1st Gen WCH LEDs
Junction Boxes:
WRRS
WRRS
WRRS
WRRS
Gate Lights:
Alstom Aurora LEDs
Alstom Aurora LEDs
Alstom Aurora LEDs
Alstom Aurora LEDs
Gate Mechanism:
WCH Style 3.5 w/ Old WCH Gate Saver
WCH Style 3.5 w/ Old WCH Gate Saver
WCH Style 3.5 w/ Old WCH Gate Saver
WCH Style 3.5 w/ Old WCH Gate Saver
Gate Striping:
Diagonal Striping
Diagonal Striping
Diagonal Striping
Diagonal Striping
>>>>>>>>>>>>>>
Northwestern Pedestrian Gate
Northeastern Pedestrian Gate
Southwestern Pedestrian Gate
Southeastern Pedestrian Gate
Base:
Siemens 5" Single Sided ^
Siemens 5" Single Sided ^
Siemens 5" Single Sided ^
Siemens 5" Single Sided ^
Gate Light:
4" RECO LED
4" RECO LED
4" RECO LED
4" RECO LED
Gate Mechanism:
Siemens Sticker Style 2
Siemens Sticker Style 2
Siemens Sticker Style 2
Siemens Sticker Style 2
Gate Striping:
Vertical Striping
Vertical Striping
Vertical Striping
Vertical Striping
Pictures 1-58 and the 1st video were taken on January 15, 2015.
Pictures 59-70 were taken on November 24, 2017.
Pictures 71-88 were taken on February 27, 2018.
The 2nd video was taken on September 22, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Joliet Sub.
ICC photos from the early 2000s showing two very old signals with 12"x24" incandescents, GRS Type B gate mechanisms, and a Safetran M Bell . By 2003, these were replaced with a WCH quad gated setup.
1
2
Overview of a quad gate setup facing east.
Overview facing west.
The western entrance signal.
The eastern entrance signal.
28
29
30
The western exit signal.
The relay bungalow in the northwest quadrant.
The grade is all concrete.
Track view facing south towards US 24 .
Track view facing north towards Division St. #2 .
55
56
57
58
Action shots from the SB Texas Eagle.
By November 2017, UP had started installation of pedestrian gates at the crossing.
59
60
Overview facing east.
Overview facing west.
The new pedestrian gates.
The new eastern pedestrian gates.
69
70
A
look at the NB signal protecting the diamond with the TP&W. I
love these short signals UP installed during the 2000s.
By February 2018, the pedestrian gates were activated.
71
72
Overview of the completed setup facing east.
Overview facing west.
The southwestern pedestrian gate.
The northwestern pedestrian gate.
The northeastern pedestrian gate.
The southeastern pedestrian gate.
VIDEO
VIDEO