43.12


176974V

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: None GS Type 2 E-Bell
Base: Safetran 5" Single Sided ^ Safetran 5" Single Sided ^
Lights: 6 - 12"x24" Safetran w/ GE Pixelated Look LEDs 4 - 12"x24" Safetran w/ GE Pixelated Look LEDs
Junction Box: 2 - Safetran Safetran
Gate Lights: 3 - NEG 4" LEDs 3 - RECO 4" LEDs
Gate Mechanism: Safetran Late 1970s w/ GSI Gate Saver Safetran 1990s w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-28 were taken on May 9, 2021, by Tommy McGowan.
Pictures 29-69 and the video were taken on April 25, 2026, by Rus.
This crossing is located on the UP Harvard Sub or Metra UP Northwest Line.

1 2
Overview of 2 gated signals facing north. Overview facing south.
3 4 5
6 7 8
9 10 11 12
The southern signal.
13 14 15
16 17 18 19
20 21 22 23
The northern signal.
24 25 26 27
The relay case in the southwest quadrant. The grade is all concrete. Track view facing west towards Oak St. Track view facing east towards Grant St.
28
Metra trains tied down for the weekend in Crystal Lake.

By April 2026, all Electro-Tech's were replaced with GE Pixelated Look LEDs and the gate lights on the northern signal were replaced with NEG 4" LED gate lights.

29
30
Overview of the updated setup facing north.Overview facing south.
31 32 33 34
35 36 37 38
39 40 41 42
The updated northern signal.
43 44 45
46 47 48 49
50 51 52 53
The updated southern signal. I was very pleased to hear a GS type 2 and not a type 3. With the amount of type 3s popping up everywhere, this was nice to hear.
54
55
56
57
The relay case in the southwest quadrant.The grade is all concrete.Track view facing east towards Grant St.Track view facing west towards Oak St.
58 59 60 61
62 63 64 65
66 67 68 69
Action shots from the video below.