Western Signal
Eastern Signal
Bell:GS Type 2 E Bell
GS Type 2 E Bell
Base: WCH Single Sided
WCH Single Sided
Main Lights: 2 pairs of 12"x20" Dialight Ball LEDs in older Safetran frames
2 pairs of 12"x20" Dialight Ball LEDs in older Safetran frames (1 Hawker logo)
Light Bracket:
Safetran
Safetran
Gate Lights: 4" RECO LEDs
4" RECO LEDs
Gate Mechanism: Safetran
Safetran
Gate Striping: ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Crossbuck font:
Normal font, double sided
Normal font, double sided
Bell Cycle: Rings from startup to when the gates start rising.
Rings from startup to when the gates start rising

Pictures 1-25 were taken on March 14, 2015.
Pictures 26-43 were taken on March 12, 2016.
The video was taken on March 15, 2016.
All pictures and video were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights on it as well.

1
2
Overview of 2 gated signals looking east.
Overview facing west.
3
4
5
6
7
8
9
10
11
The western signal.  Note the old base in Picture 11.
12
13
14
15
16
17
18
19
The eastern signal.  This was moved back when the track leading to the cold storage plant to the south.
20
21
The new relay bungalow on the south side in between the 2 main tracks.
The "old" bungalow seen damaged sitting by the depot in Coal City.
22
23
24
25
The grades are all concrete.
Looking towards the cold storage plant to the south.
Track view facing south towards Murphy Rd. in Coal City.
Track view facing north towards River Rd.

Note the construction in the photos above.  BNSF was in the process of added a new main track next to the WB track, making the old EB main a siding, and adding 3 more new sidings as well.  The lead for the cold storage facility was realigned slightly as well to connect to the siding tracks.  The photos below show the area after this project was completed.
The signals were moved slightly in the process.  The western signal now has an L&W base, the crossbucks and track signs were replaced, and blue DOT signs were added.  The relay bungalow was either moved to the southeast quadrant, or another brand new bungalow was installed.

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Photos of the overhaul.