![]() |
![]() ![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() |
>>>>>>>>>>>>>> | Northern Signal | Southern Signal |
Bell: | GS Type 3 E Bell | GS Type 3 E Bell |
Base: | Siemens 5" Single Sided > | Siemens 5" Single Sided > |
Lights: | 4 - 12"x24" Safetran w/ Dialight Ball LEDs | 4 - 12"x24" Safetran w/ Dialight Ball LEDs |
Junction Box: | Safetran | Safetran |
Gate Lights: | 4" RECO LEDs | 4" RECO LEDs |
Gate Mechanism: | Siemens Imprinted w/ GSI Gate Saver | Siemens Imprinted w/ GSI Gate Saver |
Gate Striping: | Vertical Striping | Vertical Striping |
1 |
2 |
Overview of 2 NEG crossbucks with yield signs facing north. |
Overview facing south. |
3 | 4 |
The southern crossbuck. |
5 | 6 | 7 |
The northern crossbuck. |
8 |
9 |
10 |
The grade is all wood. |
Track view facing west towards E. 2350th St. |
Track view facing east at N. 500th Ave. |
11 |
In December 2024, I spotted a new bungalow for this crossing sitting in Galva, a sign of things to come. |
12 |
13 |
As of February 2025, the DOT tags were replaced with new blue ones and the yield signs were replaced with stop signs. However... |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
21 |
Work was underway to install new signals here. Metal foundations were installed the bungalow seen in the December was in place. |
22 |
At the same time, I spotted the new signals sitting in Galva. By late March, the new signals were installed and activated. |
23 |
24 |
Overview of the new signals facing south. | Overview facing north. |
25 |
26 |
27 |
28 |
29 |
30 |
31 |
32 |
33 |
34 |
35 |
36 |
The new northern signal. |
37 |
38 |
39 |
40 |
41 |
42 |
43 |
44 |
45 |
46 |
47 |
48 |
The new southern signal. |
49 |
50 |
51 |
52 |
The new relay bungalow in the southwest quadrant. | The grade is all wood. | Track view facing west towards E. 2350th St. |
Track view facing east at N. 500th Ave. |