Pictures 1-27 were taken on July 30, 2019.
The 1st and 2nd videos were taken on June 11, 2020.
The 3rd video was taken on June 23, 2020.
Pictures 28-39 were taken on November 3, 2020.
Pictures 40-48 were taken on January 5, 2021.
Pictures 49-55 were taken on February 9, 2021.
Pictures 56-61 and the 4th and 5th videos were taken on March 24, 2021.
The 6th video was taken on August 8, 2021.
Pictures 62-84 were taken on September 14, 2021.
Pictures 85-109 and the 7th and 8th videos were taken on September 22, 2021.
Pictures 110-149 and the 9th video were taken on October 1, 2021.
Pictures 150-159 were taken on October 30, 2021.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.
1
2
Overview of 2 gated signals facing north.
Overview facing south.
3
4
5
6
7
8
9
10
11
12
The southern signal. This signal had a WCH base, older 12"x24" WCH frames with Electro-Tech's LEDs, and a dead WCH E-Bell.
13
14
15
16
17
18
19
20
21
22
The northern signal. This signal also had a WCH base, older 12"x24" WCH frames with Electro-Tech's LEDs, and a WCH Type 4 E-Bell. Both signals originally had 20" backgrounds.
23
24
25
26
The relay bungalows in the northwest quadrant, PTMW S/N 4422, and Safetran S/N R0529-040.
Track view facing east towards Red Brick Rd. in Nachusa.
27
Newer wayside signals just west of the crossing.
28
29
30
31
32
33
34
35
36
37
38
39
In October 2020, we see work was underway to replace the signals here. Conduit had been installed by this point.
40
41
42
43
44
45
46
47
48
In January 2021, we see a new bungalow was behind the current ones. This'll be used to control the crossing and wayside signals instead of having 2 separate ones like it is currently.
49
50
51
52
53
54
55
In February 2021, we see a PTC antenna was added to the new bungalow. No other changes have occurred by this point.
56
57
58
59
60
61
In March 2021, we a new PTC tower was added next to the new bungalow. The dead WCH bell was also replaced by this point with a WCH Type 1.5 E-Bell.
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
By September 2021, work was finally progressing. One new foundation was one with the other sitting off to the side.
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
By September 22nd, the other foundation was installed, the new signals were on the ground waiting for install, and new wayside signals had also been erected. By September 30th, the new crossing signals were installed and activated.
Track view facing east towards Red Brick Rd. in Nachusa.
138
139
140
141
142
143
144
145
146
147
148
149
Additional photos of the progress. By this point, the old wayside signals were still active and the old bungalows were still in place.
150
151
152
153
154
155
156
157
158
159
By October 30th, the old bungalows had been removed, and the new wayside signals were activated. The old signals were laying on the ground with their foundations still in place.