37.01


176959T

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: N/A NEG E-Bell
Cantilever: N/A Safetran
Base: Safetran 5" Single Sided Safetran 5" Single Sided
Light Brackets: 2 - Safetran 2 - Safetran
Lights: 7 - 12"x24" Safetran w/ Electro-Tech's LEDs
1 - 12"x24" Hawker Safetran w/ Electro-Tech's LEDs
4 - 12"x24" Hawker Safetran w/ Electro-Tech's LEDs
4 - 12"x24" Hawker Safetran w/ GE Pixelated Look LEDs
Gate Lights: 3 - RECO 4" LEDs 3 - RECO 4" LEDs
Gate Mechanism: Safetran 1990s w/ Wishbone Mount Safetran 1990s w/ Wishbone Mount
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-30 and the 1st video were taken on July 27, 2025, by Rus.
Pictures 31-34 and videos 2-3 were taken on October 25, 2025, by Rus.
Pictures 35-40 were taken on March 7, 2026, by Rus.
This crossing is located on the UP Harvard Sub or Metra UP Northwest Line.
Page created by Rus (using HopenRXRTools 1.3.0).

1
2
Overview of 2 gated signals and a cantilever facing north.Overview facing south.
3 4 5
6 7 8
9 10 11 12
The northern signal.
13 14 15 16
17 18 19 20
21 22 23 24
The southern signal.
25
26
27
28
The relay bungalow in the southwest quadrant.The grade is all concrete, which was recently resurfaced at the time.Track view facing east towards Algonquin Rd.Track view facing west towards Jandus Cutoff Rd. in Cary.
29 30 31
32 33 34
Action shots.

Metra's site had said that this crossing was due for replacement in 2025, but I haven't been back for updates. No conduit was present, nor were any signs of new signals at my most recent visit in October 25, 2025.

Unfortunately, by early March, its ASC was replaced. The mast lights on the southern signal were replaced as well.

35 36 37
38 39 40
Updated shots. Apparently, the bell was just too quiet, which is stupid considering NEGs are usually quiet too.