17.18


386408P

>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: Siemens E-Bell High Tone Siemens E-Bell Low Tone
Cantilever: N/A FS/WCH Cantilever
Mast Base: Siemens 5" Double Sided
Safetran 5" Single Sided ^
Griswold 5" Single Sided ^
Lights: 4 - 12"x24" Safetran w/ Harmon Fading LEDs 4 - 12"x24" WCH w/ Harmon Fading LEDs
4 - 12"x24" Safetran w/ Harmon Fading LEDs
Junction Boxes: Safetran 1 - WRRS
1 - MI
Gate Lights: 3 - RECO 4" LEDs 3 - RECO 4" LEDs
Gate Mechanism: Safetran 2000s w/ Standard Mount Safetran 1990s w/ Standard Mount
Gate Striping: Vertical Striping Vertical Striping


>>>>>>>>>>>>>> Northwestern Pedestrian Gate Northeastern Pedestrian Gate Southeastern Pedestrian Gate
Base: WCH 5" Single Sided ^ Safetran 5" Single Sided ^ WCH 5" Single Sided ^
Gate Mechanism: WCH Style 3.5 Safetran 2000s WCH Style 3.5
Gate Striping: Vertical Striping Vertical Striping Vertical Striping

Pictures 1-44 and the 1st video were taken on February 21, 2018, by Tommy McGowan.
The 2nd video was taken on July 16, 2025, by Rus.
Pictures 45-89 and the 3rd video were taken on November 23, 2025, by Rus.
This crossing is located on the Metra Milwaukee North District.

1
2
Overview of 2 gated cantilevers and 3 pedestrian gates facing east.
Overview facing west.
3 4 5
6 7 8
9 10 11
12 13 14 15
The western signal.
16 17 18
19 20 21
22 23 24
25 26 27 28
The eastern signal.
29 30 31 32
The southeastern pedestrian gate.
33 34 35 36
The northeastern pedestrian gate.  Not sure why this side needs 2 gates to protect the sidewalk.
37 38 39 40
The northwestern pedestrian gate.
41 42 43 44
The relay bungalow in the southeast quadrant.
The grade is all rubber.
Track view facing north at Glenview Station #1.
Track view facing south at Dewes St.

A return visit in November 2025 by Rus shows several changes. The western cantilever was downgraded to a mast-only signal, both road signals now have Siemens E-Bells, the DOT tags were replaced, and all gates were either replaced or restriped with the newer block style striping.

45
46
Overview facing east.Overview facing west.
47 48 49
50 51 52 53
54 55 56 57
The eastern signal. There was construction at the time, so these aren't the best photos.
58 59 60 61
62 63 64 65
66 67 68 69
The newer western signal.
70 71 72 73
The northeastern pedestrian signal.
74 75 76 77
The northwestern pedestrian signal.
78 79 80 81
The southeastern pedestrian signal.
82
83
84
85
The relay bungalow in the southeastern quadrant.The grade is all concrete.Track view facing north towards Glenview Station #1.Track view facing south towards Dewes St.
86 87 88 89
The crossing in action from the 3rd video.