Pictures 1-25 were taken on January 21, 2016.
Pictures 26-34 and the 1st video were taken on August 27, 2019.
Pictures 35-43 were taken on May 6, 2020.
Pictures 44-53 were taken on May 28, 2020.
The 2nd video was taken on June 3, 2020.
Pictures 54-63 were taken on June 11, 2020.
Pictures 64-72 were taken on June 23, 2020.
Pictures 73-89 and the 3rd and 4th videos were taken on July 1, 2020.
Pictures 90-117 and the 5th, 6th, and 7th videos were taken on July 3, 2020.
Pictures 118-126 were taken on August 26, 2020.
Picture 127 was taken on October 7, 2020.
Pictures 128-132 were taken on November 18, 2020.
The 8th video was taken on February 26, 2021.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.
1
2
Overview of 2 gated signals facing south.
Overview facing north.
3
4
5
6
7
8
9
10
11
The northern signal. This signal had 12"x24" Safetran frames with Electro-Tech's LEDs, a Safetran base, and a mid 1970s Safetran gate mechanism.
12
13
14
15
16
17
18
19
20
21
The southern signal. This signal also had 12"x24" Safetran frames with Electro-Tech's LEDs, a Safetran base, and a mid 1970s Safetran gate mechanism, plus a WCH E-Bell.
In August 2019, we
see the Electro-Tech's LEDs were replaced by GE Dotted LEDs, the WCH E
Bell was replaced by a GS Type 3, both track signs were replaced, and
the southern signal's crossbuck was replaced.
35
36
37
38
39
40
41
42
43
On May 6, 2020, we
see work was underway to replace the signals here and the other 2
crossings in town. Conduit was installed all around the crossing,
and a new bungalow was sitting in DeKalb waiting for installation. The grade had also been resurfaced by this point.
44
45
46
47
48
49
50
51
52
53
On May 28th, we see
the new relay bungalow was installed in the northwest quadrant.
The new foundations were also sitting off to the side. By this
point, 4th St. had gotten its new signals as seen in Picture 49.
54
55
56
57
58
59
60
61
62
63
By June 11th, a PTC
antenna was installed on the new bungalow here and the other 2
crossings in town. Not much else changed by this point.
64
65
66
67
68
69
70
71
72
On June 23rd, we see
the new foundations were installed. By this point, the new
signals were installed at 3rd St., leaving 4th St. as the last crossing
with old signals in downtown Malta.
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
On July 1st, the new
signals were delivered to the crossing and had its lights
installed. They were sitting on the ground waiting for
installation.
On July 3rd, 2020, the new signals
were installed. I live streamed most of the process and filmed
the entire thing, and all those videos are down below. The photos
below were taken right after the last UP employees left for the day, so
these are the freshest signals on the site.
90
91
Overview of the finished install facing north.
Overview facing south.
92
93
94
95
96
97
98
99
100
101
The new southern signal.
102
103
104
105
106
107
108
109
110
111
The new northern signal.
112
113
114
115
The PTMW new relay bungalow S/N 103461 in the northwest quadrant, along with the old northern signal's foundation.
The old relay case
remains along with the foundation of the southern signal. They
surprisingly removed the northern signal's foundation the same day it
was replaced.
118
119
120
121
122
123
124
125
126
On August 26th, we
see gravel was laid around the signals and bungalow and the southern
signal's foundation was removed. The old reley case still remains
in place.
In Picture 126, we see a large tree nearby the crossing had a large
portion of it broken off from the derecho storms that hit the area on
August 10th. Compare Picture 126 and 90 to see before and after.
127
On October 7th, we see the old relay case was finally removed.