Pictures 1-25 were taken on January 21, 2016.
Pictures 26-29 and the 1st video were taken on August 27, 2019.
Pictures 30-35 were taken on May 6, 2020.
The 2nd video was taken on May 13, 2020.
Pictures 36-47 were taken on May 28, 2020.
Pictures 48-57 were taken on June 11, 2020.
Pictures 58-88 were taken on June 23, 2020.
The 3rd video was taken on July 1, 2020.
The 4th video was taken on July 2, 2020.
Pictures 89-96 were taken on August 26, 2020.
Picture 97 was taken on October 7, 2020.
Pictures 98-103 were taken on November 18, 2020.
The 5th video was taken on August 20, 2022.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.
1
2
Overview of 2 gated signals facing south.
Overview facing north.
3
4
5
6
7
8
9
10
11
The northern signal. This signal had 12"x24" Safetran frames with Electro-Tech's LEDs, a Safetran base, and a mid 1970s Safetran gate mechanism.
12
13
14
15
16
17
18
19
20
21
The southern signal. This signal also had 12"x24" Safetran frames with Electro-Tech's LEDs, a Safetran base, and a mid 1970s Safetran gate mechanism, plus a WCH Type 3 E-Bell.
By August 2019, the only
change here was the southern signal's gate being replaced. This
is the last crossing of the 3 in town to retain Electro-Tech's LEDs.
30
31
32
33
34
35
On May 6th, 2020, we
see work had begun to replace the signals here and at the other 2
crossings in town. A new bungalow was waiting in DeKalb for
installation.
36
37
38
39
40
41
42
43
44
45
46
47
On May 28th, we see
the bungalow was installed in the northeast quadrant. According
to a resident who talked to me, UP was going to put it originally in
the northwest quadrant on his property, and after some legal trouble,
he managed to get UP to install it across the street instead.
Also by this point, the new signals were already installed at 4th St.
48
49
50
51
52
53
54
55
56
57
By June 11th, the
foundations for the new signals had been installed. A PTC antenna
was installed on the new bungalow here and on other 2 new bungalows at
the other crossings in town.
Between June 11th and 23rd, the new signals were installed.
58
59
Overview of the new signals facing south.
Overview facing north.
60
61
62
63
64
65
66
67
68
69
The new northern signal.
70
71
72
73
74
75
76
77
78
79
The new southern signal.
80
81
82
83
The PTMW relay bungalow in the northeast quadrant S/N 103464.
Some other photos of
the progress. The old relay case was still in along with the
foundations of the old signals. At this point too, the old
signals at 2nd St. were still active.
89
90
91
92
93
94
95
96
As of August 26th, we see gravel was laid around the new signals and both foundations for the old signals had been removed. The old relay case still remained.
97
On October 7th, we see the old relay case was finally removed.