Pictures 1-25 were taken on January 21, 2016.
Pictures 26-33 were taken on August 27, 2019.
Pictures 34-40 and the 1st video were taken on May 6, 2020.
The 2nd video was taken on May 13, 2020.
Pictures 41-71 and the 3rd video were taken on May 28, 2020.
Pictures 72-80 were taken on August 26, 2020.
Picture 81 was taken on October 7, 2020.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.
1
2
Overview of 2 gated signals facing south.
Overview facing north.
3
4
5
6
7
8
9
10
11
The northern signal.This signal had 12"x24" Safetran frames with Electro-Tech's LEDs, a Safetran base, and a mid 1970s Safetran gate mechanism.
12
13
14
15
16
17
18
19
20
21
The southern signal. This signal also had 12"x24" Safetran frames with Electro-Tech's LEDs, a Safetran base, and a mid 1970s Safetran gate mechanism, plus a Safetran mechanical bell! This was the last mechanical bell outside of Chicago on the Geneva Sub.
22
23
24
25
The relay case in the southeast quadrant.
The northern track's grade is all concrete and the southern track is wood and asphalt.
Track view facing east towards Nelson Rd. in DeKalb.
26
27
28
29
30
31
32
33
In
August 2019, we see the Electro-Tech's LEDs were replaced with GE
Dotted LEDs, the southern signal's gate was replaced, and sadly the
mechanical bell was replaced. There are now no more mechanical
bells between Elburn and Clinton, IA.
34
35
36
37
38
39
40
In May 2020, we see
work was underway to replace the signals here. Conduit was
installed all around the crossing, and a new bungalow was sitting in
DeKalb.
Between May 13th and 28th, 2020, the new bungalow was installed here, followed shortly after by the new Siemens signals.
41
42
Overview of the new signals facing north.
Overview facing south.
43
44
45
46
47
48
46
47
48
49
50
51
52
53
The new southern signal.
54
55
56
57
58
59
60
61
62
63
The new northern signal.
64
65
66
67
The new PTMW relay bungalow in the northeast quadrant S/N 103324.
Track view facing east towards Nelson Rd. in DeKalb.
68
69
70
71
Other work was still
yet to be done here at 4th St., plus the other 2 crossings. They
still had their old signals as of May 28th.
72
73
74
75
76
77
78
79
On August 26th, we see gravel was added around the signals and the old foundation were removed. A PTC antenna was also added to the new bungalow. The old relay was still in at this point as well. Also, there were a bunch of skin care bottles lying around here. Random.
80
On October 7th, we see the old relay case was finally removed.