MP: 50.49

Updated February 2021

Total Accidents:  2
Crossing DOT #:  175019B
TOTAL DAILY TRAINS:  54   (AS OF 2017)

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: NEG E-Bell NEG E-Bell
Base: Siemens 5" Single Sided > Siemens 5" Single Sided >
Lights: 4 - 12"x24" Safetran w/ GE Dotted LEDs 4 - 12"x24" Safetran w/ GE Dotted LEDs
Junction Box: Safetran Safetran
Gate Lights: 3 - NEG Clear LEDs 3 - NEG Clear LEDs
Gate Mechanism: Siemens Imprinted w/ New NEG 2 Way Saver Siemens Imprinted w/ New NEG 2 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-25 were taken on January 21, 2016.
Pictures 26-31 and the 1st video were taken on August 27, 2019.
Picture 32 was taken on May 6, 2020.
Pictures 33-43 and the 2nd video were taken on May 13, 2020.
Pictures 44-71 were taken on May 28, 2020.
Picture 72 was taken on June 3, 2020.
The 3rd video was taken on July 2, 2020.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.

1
2
Overview of 2 gated signals facing south.
Overview facing north.
3 4 5
6 7 8
9 10 11
The northern signal. Both signals had a Safetran base, 12"x24" Safetran frames with Electro-Tech's LEDs, 4" RECO LEDs, and a Safetran 1980s gate mechanism.
12 13 14
15 16 17
18 19 20 21
The southern signal. This had a WCH Type 2 E-Bell.
22 23 24 25
The relay bungalow in the southwest quadrant.
The grade is all concrete.
Track view facing west at Pleasant St.
Track view facing east towards Howard Rd.
26 27
28 29 30 31
In August 2019, we see both gates were replaced.
32
In May 2020, work was underway to replace the signals here. On May 6th, a new bungalow was spotted in DeKalb.
33 34 35
36 37 38 39
40 41 42 43
On May 13th, we see conduit was installed around the crossing in preparation for replacement.

Between May 13th and May 28th, the new signals were installed.

44 45
Overview of the new signals facing south. Overview facing north.
46 47 48
49 50 51
52 53 54 55
The new northern signal.
56 57 58
59 60 61
62 63 64 65
In August 2019, we see both gates were replaced.
66 67 68 69
The old and new relay bungalows in the southwest quadrant. The grade is all concrete. Track view facing west at Pleasant St.
Track view facing east towards Howard Rd.
70 71
Additional side views of the new signals.
72
On June 3rd, we see the old relay bungalow was removed.