181.90


532541W

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS E-Bell None
Base: Siemens 5" Double Sided ^ Siemens 5" Double Sided ^
Lights: 4 - 12"x20" Safetran w/ GE Uniform Look LEDs 4 - 12"x20" Safetran w/ GE Uniform Look LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO 4" RECO
Gate Mechanism: Siemens Imprinted w/ NEG 1 Way Saver Siemens Imprinted w/ NEG 1 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-19 were taken on February 5, 2016.
Pictures 20-23 were taken on November 17, 2016.
The video was taken on August 10, 2020.
Pictures 24-49 were taken on March 18, 2024.
Pictures 50-60 were taken on April 7, 2024.
All pictures and video were taken by Tommy McGowan.
This crossing is located on the NS Kankakee District.

1 2
Overview of 2 very nice gateless signals facing south.
Overview facing north.
3 4 5
6 7 8 9
The northern signal. Both signals had GRS bases and 12"x24" Safetran incandescents. This had a 1st Gen WCH Mechanical Bell.
10 11 12
13 14 15
The southern signal.
16 17 18 19
The relay case in the northwest quadrant.
The grade is rubber and asphalt.
Track view facing west at Hennepin St.
Track view facing east towards Main St. in Granville.
20 21 22 23
In November 2016, we see the DOT signs were turned to face forward.

In late February or early March 2024, both signals were replaced with brand new Siemens signals. However by this point, the gates had not been installed.

24 25
Overview of the new temporarily gateless signals facing south. Overview facing north.
26 27 28
29 30 31
32 33 34 35
The new northern signal.
36 37 38
39 40 41
42 43 44
The new southern signal.
45 46 47 48
The new relay bungalow in the northeast quadrant.
The grade is rubber and asphalt.
Track view facing west at Hennepin St.
Track view facing east towards Main St. in Granville.
49
The old relay case was still in at this point.
50 51
52 53 54 55
56 57 58 59
In April 2024, we see gates were finally added to the new signals, thus finishing the setup.
60
The new bungalow also had a PTC antenna installed. Also by this point, the old relay case had been removed.