20.06



260632Y

>>>>>>>>>>>>>>> Northern Shoulder Signal Northern Median Signal Southern Shoulder Signal Southern Median Signal
Bell: Safetran Type 3 E-Bell Low Tone None Siemens E-Bell Low Tone None
Base: Safetran 5" Single Sided > Safetran 4" Single Sided > Safetran 5" Single Sided > Safetran 4" Single Sided >
Lights: 4 - 12"x24" Safetran w/ GE Uniform Look LEDs 4 - 12"x24" Safetran w/ Harmon Fading LEDs 4 - 12"x24" Safetran w/ GE Uniform Look LEDs 4 - 12"x24" Safetran w/ Harmon Fading LEDs
Junction Box: Safetran Safetran Safetran Safetran
Gate Lights: 4" RECO LEDs None 4" RECO LEDs None
Gate Mechanism: Safetran 2000s w/ GSI Gate Saver None Safetran 2000s w/ GSI Gate Saver None
Gate Striping: Vertical Striping N/A Vertical Striping N/A

>>>>>>>>>>>>>> Northern Pedestrian Signal Southern Pedestrian Signal
Bell: Siemens E-Bell Low Tone Siemens E-Bell Low Tone
Base: Siemens 5" Single Sided > Siemens 5" Single Sided <
Lights: 4 - 12"x24" Safetran w/ GE Uniform Look LEDs 4 - 12"x24" Safetran w/ GE Uniform Look LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: Siemens Imprinted w/ Standard Mount Siemens Imprinted w/ Standard Mount
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-38 were taken on November 29, 2015.
The 1st video was taken on December 1, 2018.
The 2nd video was taken on December 22, 2018.
Pictures 39-66 were taken on March 12, 2022.
Pictures 67-70 and the 3rd video were taken on April 6, 2023.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the CN Matteson Sub, formerly the EJ&E Eastern Sub.

1
2
Overview of 2 gated and 2 gateless signals facing south.
Overview facing north.
3 4 5
6 7 8
9 10 11 12
The northern shoulder signal.
13 14 15
16 17 18
19 20 21 22
The southern shoulder signal.
23 24 25
26 27 28
The southern median signal.
29 30 31
32 33 34
The northern median signal.
35 36 37 38
The relay bungalow in the northeast quadrant.
The grade is all rubber.
Track view facing west towards Central Ave.
Track view facing east towards Main St.

In late 2021, two new signals were installed just west of the road crossing in preparation for a new bike to be constructed alongside Cicero Ave. By March 2022, the signals were operational, but the bike path hadn't been built yet.

39
40
41 42 43 44
The shoulder signals got new DOT tags and new wind guards, plus the southern shoulder signal's Safetran Type 3 was replaced with a Siemens E-Bell.
45 46 47
48 49 50 51
52 53 54 55
The new northern pedestrian signal.
56 57 58
59 60 61
62 63 64 65
The new southern pedestrian signal.
66
The relay bungalow also had a PTC antenna installed on it by this point.
67 68 69 70
In Aprli 2023, we see the bike path was finished, but oddly enough, the DOT tags that were on the new signals were removed. No idea why this was done.