21.61



260636B

>>>>>>>>>>>>>>> Northern Signal Mainline Southern Signal Mainline Northern Signal Connector Southern Signal Connector
Bell: Safetran Type 3 E-Bell Low Tone Safetran Type 3 E-Bell Low Tone Siemens E-Bell Low Tone Safetran Type 3 E-Bell Low Tone
Base: Safetran 5" Single Sided > Safetran 5" Single Sided > Safetran 5" Single Sided > Safetran 5" Single Sided >
Lights: 4 - 12"x24" Safetran w/ Harmon Fading LEDs 4 - 12"x24" Safetran w/ Harmon Fading LEDs 4 - 12"x24" Safetran w/ Harmon Fading LEDs 4 - 12"x24" Safetran w/ Harmon Fading LEDs
Junction Box: Safetran Safetran Safetran Safetran
Gate Lights: 4" RECO LEDs 4" RECO LEDs 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping Vertical Striping Vertical Striping


>>>>>>>>>>>>>> Northern Pedestrian Gate Mainline Southern Pedestrian Gate Mainline Northern Pedestrian Gate Connector Southern Pedestrian Gate Connector
Base: Safetran 5" Single Sided < Safetran 5" Single Sided > Safetran 5" Single Sided < Safetran 5" Single Sided >
Gate Light: 4" RECO LED 4" RECO LED 4" RECO LED 4" RECO LED
Gate Mechanism: Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping Vertical Striping Vertical Striping

Pictures 1-69 were taken on March 23, 2016.
The video was taken on December 8, 2016.
Pictures 70-80 were taken on March 8 2019.
All pictures and video were taken by Tommy McGowan.
This crossing is located on the CN Matteson Sub, formerly the EJ&E Eastern Sub.  It is a double crossing setup with on crossing on the mainline and one on a connector track between this line and the CN Chicago Sub.

First I'll show the main crossing, and then the connector crossing.
*The inner gated signal's bells will ring for most of the duration if a train is on the opposite track to which that signal protects (eg, the connector track's bell will continue to ring if a train is on the mainline).

1
2
Overview of the main crossing facing north.
Overview facing south.
3 4 5
6 7 8
9 10 11 12
The southern signal.  Note the one 20" background.
13 14 15
16 17 18 19
20 21 22 23
The northern signal.
24 25 26 27
The southern pedestrian gate.
28 29 30 31
The northern pedestrian gate.  Both have a Safetran base and gate mechanism, and a 4" RECO LED.
32 33 34 35
The relay bungalow in the southwest quadrant.
The grade is all rubber.
Track view facing west towards Route 50.
Track view facing east towards Western Ave. in Park Forest.
36 37
Overview of the connector crossing facing south.
Overview facing north.
38 39 40
41 42 43
44 45 46 47
The northern signal.
48 49 50
51 52 53 54
55 56 57 58
The southern signal.
59 60 61 62
The northern pedestrain gate.
63 64 65 66
The southern pedestrian gate.  Both of these gates also have a Safetran base and gate mechanism, and a 4" RECO LED.
67 68 69
The grade is all rubber.
Track view facing southwest towards Stuenkel Rd. in University Park.
Track view facing east towards Western Ave. in Park Forest.
70 71
72 73 74 75
76 77
78 79 80
In March 2019, we see all of the track signs were replaced, plus the DOT signs were turned ot face forward.  Also the lone 20" background on the southern main signal was replaced with a 24" one.