61.50


178807D

>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: GS Type 3 E-Bell GS Type 3 E-Bell
Base: WCH 5" Single Sided ^ WCH 5" Single Sided ^
Lights: 4 - 12"x20" WCH w/ Electro-Tech's LEDs 4 - 12"x20" WCH w/ Electro-Tech's LEDs
Junction Box: WRRS WRRS
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: WCH Style 3.5 w/ GSI Gate Saver WCH Style 3.5 w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping

All pictures were taken on May 9, 2021, by Tommy McGowan.
The video was taken on October 16, 2019, by Tommy McGowan.
This crossing is located on the UP McHenry Branch.

1 2
Overview of 2 late 90s WCH signals facing west. Overview facing east.
3 4 5
6 7 8
9 10 11 12
The eastern signal.
13 14 15
16 17 18
19 20 21 22
The western signal.
23 24 25 26
The relay bungalow in the northeast quadrant. The grade is all concrete. Track view facing north towards Bull Valley Rd. Track view facing south towards Hillside Rd. in Crystal Lake.