Pictures 1-25 were taken on November 25, 2015.
The 1st video was taken on December 23, 2019.
Pictures 26-55 were taken on March 29, 2023.
The 2nd video was taken on June 16, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Mendota Sub.
1
2
Overview of 2 gated signals facing south.
Overview facing north.
3
4
5
6
7
8
9
10
11
The northern signal. Both signals had WCH bases, 12"x20" Safetran frames with Dialight Ball LEDs, 4" RECO LEDs, and WCH Style 3 gate mechanisms.
12
13
14
15
16
17
18
19
20
21
The southern signal. This had a GS Type 2 E-Bell, which was replaced with a GS Type 3 by 2019.
22
23
24
25
The relay bungalow in the southwest quadrant.
The side track's grade is all wood, while the main tracks' are all concrete.