Pictures 1-45 were taken on November 25, 2015.
The 1st video was taken on December 23, 2019.
Pictures 46-56 and the 2nd and 3rd videos were taken on December 27, 2019.
The 4th video was taken on October 9, 2020.
Pictures 57-103 were taken on February 9, 2021.
The 5th video was taken on December 9, 2021.
All pictures and videos were taken by Tommy McGowan.
The main tracks at this crossing are on the BNSF Mendota Sub. The
side track is the former IC mainline from Centralia to Freeport.
The track dead ends a few feet south of the crossing.
1
2
Overview of 2 gated signals with 4 pedestrians gates facing west.
Overview looking east.
3
4
5
6
7
8
9
10
11
12
13
14
15
16
The eastern signal. This had General Signals LEDs in WCH and FS 12"x20" frames, a GS Type 2 E-Bell, a Western Cullen Hayes Inc. gate mechanisms, and a pedestrian gate.
17
18
19
20
21
22
23
24
25
26
27
28
29
30
The western
signal. This is exactly the same as the other signal.
Track view facing north on the mainline at 8th St.
Track view facing north on the side track at 8th St.
Track view facing south on the side track at the former connection to the mainline.
46
47
48
49
50
51
52
53
54
55
56
In December 2019, we see the gates on the pedestrian gates were replaced. At this same time, work was underway to replace the old signals here. It actually took quite a while for the work to get done, but by November 2020, the new signals were in and active. The old side track was removed in the crossing and the western signals were moved closer to the mainline.