| >>>>>>>>>>>>>>> |
Northern Signal |
Southern Signal |
| Bell: |
GS Type 2 E-Bell |
GS Type 2 E-Bell |
| Base: |
Lincoln Industries Cantilever |
GE 5" Single Sided ^ |
| Lights: |
10 - 12"x24" Harmon w/ Harmon Fading LEDs |
4 - 12"x24" Harmon w/ Harmon Fading LEDs |
| Junction Boxes: |
Harmon |
Harmon |
| Gate Lights: |
4" RECO LEDs |
4" RECO LEDs |
| Gate Mechanism: |
WCH Style 3.5 w/ Cantilever Mount |
WCH Style 3.5 w/ Standard Mount |
| Gate Striping: |
Diagonal Striping |
Diagonal Striping |
All pictures were taken on July 14, 2021.
The 1st video was taken on
July 31, 2021.
The 2nd video was taken on March 21, 2022.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the IAIS Blue Island Sub.
This crossing and road were installed new in 2008 as part of the new ethanol plant that was built here at the time.