Pictures 1-10 were taken March 5, 2007.
Pictures 11-21 were taken January 6, 2008.
Pictures 22-28 were taken December 11, 2010.
Pictures 29-48 were taken December 8, 2014.
Pictures 49-52 were taken on November 23, 2015.
The 1st video was taken on December 15, 2014.
The 2nd video was taken on January 15, 2017.
Pictures 53-59 were taken on October 21, 2024.
Pictures 60-70 were taken on December 22, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the CSX New Rock Sub with IAIS having trackage rights on it as well.
1
2
3
4
Overview facing north, then views of the southern signal. At the time, all gate lights were 4" RECO incandescent.
5
6
7
Overview facing south, then views of the northern signal. At the time, this signal had a WCH mechanical bell.
8
9
10
The crossing was repaved in June 2007 with rubber and asphalt, just like the grade before it.
11
12
13
14
15
16
17
18
19
20
21
In June 2010, the WCH M bell
was replaced by an NEG E-Bell, and the gate middle gate
light and the one at the far end of the gate were changed to LED.
The one closest to the signal is still incandescent.
In September 2009, the relay case received a power off light. Most relay cases on this line did not have one before.
22
23
24
25
26
27
28
In 2012, the crossing was repaved again, this time with wood and asphalt. The rest of the crossing appears to be the same.
In November 2015, we see the white DOT signs were replaced with blue ones.
53
54
55
56
57
58
59
In October 2024, we see the 4" NEG incandescents on the northern signal were replaced with 4" NEG LEDs. The grade was also resurfaced. At this point, the main lights were still incandescent.
60
61
62
63
64
65
66
67
68
69
70
A couple months later however, we see they were all upgraded to LED.
These signals appeared to have been
installed new in the 90s. The only change before 2007 was removal
of the 2 track signs that these signals had.