62.20


603762W

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: None NEG E-Bell
Base: WRRS 5" Single Sided ^ WCH 5" Single Sided ^
Lights: 4 - 12"x24" Safetran w/ Leotek EV LEDs 4 - 12"x24" Safetran w/ Leotek EV LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: Safetran 2000s w/ Standard Mount WCH Style 3 w/ Standard Mount
Gate Striping: Diagonal Striping Vertical and Diagonal Striping

Pictures 1-8 were taken on March 5, 2007.
Pictures 9-23 were taken on January 6, 2008.
Pictures 24-42 were taken on December 8, 2014.
Pictures 43-48 were taken on November 23, 2015.
Pictures 49-54 were taken on November 15, 2016.
The 1st video was taken on January 13, 2015.
The 2nd video was taken on January 15, 2016.
The 3rd video was taken on March 7, 2017.
Pictures 55-58 were taken on April 20, 2019.
The 4th video was taken on May 9, 2019.
The 5th video was taken on June 1, 2022.
Pictures 59-69 were taken on December 22, 2024.
All photos and videos were taken by Tommy McGowan.
This crossing is located on the CSX New Rock Sub, with IAIS have trackage rights on it as well.

1 2
Overview looking north, plus front view of the southern signal.
3 4 5
The southern signal.
6 7 8
The northern signal.

Between March 2007 and January 2008, nothing changed with the crossing.  Note the gate on the northern signal was upside down and had 4" incandescent gate lights, probably NEGs.

9 10
Overview of the crossing facing south.
Overview looking north.
11 12 13 14
The northern signal.
15 16 17 18
19 20 21
The southern signal.
22 23
The relay case in the southeast quadrant.
Track view facing west.

Less than a month after Pictures 9-23 were taken, the telegraph poles seen were taken down, except for the one right next to the relay case, which lasted until late 2008.
In September 2009, the a power off light was added to the relay case.  The hole for the telegraph lines in Picture 22 was taken off and is now in my possession.
In May 2010, the backward striped gate on the north side was replaced with the correct striping and has 4" RECO LED gate lights.
In October 2010, during a major track upgrade, the crossing was resurfaced.  The grade was asphalt and rubber before, but now it's asphalt and wood.

24 25
Overview of the crossing facing south.
Overview looking north.
26 27 28
29 30 31
The northern signal.
32 33 34 35
36 37 38
The southern signal.  The tip gate light is now LED.
39 40 41 42
The relay case in the southeast quadrant.
The wood and asphalt grade.
Track view looking west towards Shabbona St. Track view facing east towards Wauponsee St.
43 44
45 46 47 48
In November 2015, we see a couple changes.  The WRRS gate mech on the north side is now a Safetran and the white DOT signs were replaced with blue ones.  The mechanical bell is still here and is one of only 4 mechanical bells left on the CSX owned portion of this line.
49 50 51
52 53 54
In November 2016, we see the tip of the southern signal's gate was replaced with the newer gate striping.
55 56 57 58
In April 2019, we see the WCH bell was replaced by an NEG bell.  There are no more M bells in Morris, or on the mainline of the CSX New Rock Sub.
59 60
61 62 63 64
65 66 67 68
In December 2024, we see the main lights were upgraded to LED.
69
The southern advanced warning sign had also been knocked down.

It appears when the double track was removed back in the 80s or 90s, CSX put a new signal in the old one's place on the south side.  It received a new gate in the late 90s or early 2000s, and possibly new lights at the same time.