121.86


175195Y

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: NEG E-Bell NEG E-Bell
Base: Siemens 5" Single Sided > Siemens 5" Single Sided >
Lights: 4 - 12"x24" Safetran w/ GE Dotted LEDs 4 - 12"x24" Safetran w/ GE Dotted LEDs
Junction Box: Safetran Safetran
Gate Lights: NEG Clear LEDs NEG Clear LEDs
Gate Mechanism: Siemens Imprinted w/ New NEG 2 Way Saver Siemens Imprinted w/ New NEG 2 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-25 and the 1st video were taken on June 3, 2020.
Pictures 26-35 and the 2nd video were taken on October 28, 2020.
Pictures 36-44 and the 3rd video were taken on January 5, 2021.
The 4th video was taken on April 8, 2021.
Pictures 45-46 and the 5th video were taken on November 9, 2022.
Picture 47 was taken on February 8, 2023.
Pictures 48-73 were taken on June 27, 2023.
Pictures 74-102 were taken on August 3, 2023.
Pictures 103-105 were taken on December 5, 2023.
The 6th video was taken on May 9, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.

1
2
Overview of two 90s gated signals facing south. Overview facing north.
3 4 5
6 7 8
9 10 11
The northern signal. Both signals had Safetran bases, 12"x24" Hawker Safetran frames with Electro-Tech's LEDs, 4" RECO LEDs, and Safetran 1990s gate mechanisms.
12 13 14
15 16 17
18 19 20
21
The southern signal. This had a low tone 2nd Gen ASC E-Bell!
22 23 24 25
The relay bungalow in the southeast quadrant. The grade is all concrete. Track view facing west towards Sawyer Rd. Track view facing east towards Lyndon Rd.
26
27
28 29 30 31
32 33 34 35
In October 2020, we see work was underway to replace the signals here. New conduit had been installed by this point.
36 37 38
39 40 41
42 43 44
In January 2021, we see the new bungalow was in place in the northeast quadrant. The DOT sign on the northern signal is also facing forward now. As of June 22nd, no additional work has been done yet.
45
46
As of November 2022, nothing had changed here.
47
By February 2023, still nothing.
48
49
50 51 52 53
54 55 56 57
58 59 60 61
62 63 64 65
66 67 68 69
70 71 72 73
By June 2023 however, work finally progressed. New foundations were installed, the conduit was buried, and the new signals were sitting off to the side ready for install. It would be any day now, and by early August, the new signals were installed and activated.
74
75
Overview of two 90s gated signals facing south. Overview facing north.
76 77 78
79 80 81
82
83 84 85
86
By February 2023, still nothing.
87 88 89
90 91 92
93
94 95 96
97
By February 2023, still nothing.
98 99 100 101
The new relay bungalow in the northeast quadrant. The grade is all concrete. Track view facing west towards Sawyer Rd. Track view facing east towards Lyndon Rd.
102
The old relay bungalow was still in at this point.
103 104 105
By December 2023, the old relay bungalow was removed, thus finishing the new setup.