Pictures 1-25 were taken on July 30, 2019.
The 1st video was taken on June 3, 2020.
Pictures 26-28 were taken on October 7, 2020.
Pictures 29-39 and the 2nd video were taken on
November 3, 2020.
Pictures 40-46 were taken on January 5, 2021.
Pictures 47-53 were taken on February 9, 2021.
Pictures 54-56 and the 3rd video were taken on March 10, 2021.
Pictures 57-59 were taken on June 22, 2021.
Pictures 60-65 and the 4th video were taken on July 7, 2021.
Pictures 66-79 were taken on August 8, 2021.
Pictures 80-89 and the 5th video were taken on August 13, 2021.
The 6th video was taken on September 2, 2021.
Pictures 90-119 were taken on September 14, 2021.
The 7th video was taken on October 1, 2021.
Pictures 120-123 were taken on October 30, 2021.
Pictures 124-131 and the 8th video were taken on June 23, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Geneva Sub.
In October 2020, a new bungalow was spotted sitting in Sterling for this crossing along with several foundations for this and other crossings. The wayside signals at Nachusa are also being replaced hence the new wayside bungalow.
29
30
31
32
33
34
35
36
37
38
39
In November 2020, we see conduit was installed all around the crossing in preparation for new signals. At the same time, UP is also working on replacing the searchlight signals just east of here.
40
41
42
43
44
45
46
In January 2021, we see the new bungalow was installed at the crossing.
47
48
49
50
51
52
53
In February 2021, we see a PTC antenna was added to the new bungalow. By this point, the new bungalow for the crossovers east of here was also installed. The searchlights and crossing signals both have their days numbered.
54
55
56
In March 2021 in an odd move, we see the old searchlights from Cortland were moved and dropped off here in Nachusa. I have no idea why UP did this. No changes have occurred with the crossing.
57
58
59
In June 2021, we see work is ramping up now in Nachusa, with the new wayside signals on the ground getting ready to be installed. A new foundation likely for the crossing was also seen by the old relay case.
60
61
62
63
64
65
In July 2021, we see a 2nd foundation now behind the second relay case, and the old searchlights from Cortland were loaded back onto a trailer. Still no clue why they were here in the first place. The new wayside signals for Nachusa were also installed by this point.
66
67
68
69
70
71
72
73
74
75
76
77
78
79
On August 8th, we see machinery standing by as UP was about to install the new foundations for the new crossing signals.
80
81
82
83
84
85
86
87
88
89
On August 13th, we see the new foundations had been installed.
On September 14, 2021, the new signals were finally installed here. I managed to come out the same day to get pictures of the fresh install.